ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
Organize the pieces of your Pure Cube outdoor sauna.
Start the assembly by laying out the floor supports.
3
Secure the corners of the floor supports together using
2 ½” (64mm) screws in the pre drilled holes.
Repeat for all 4 corners.
Space out the floor joists evenly.
Once the floor joists are spaced out evenly, secure them
through the pre drilled pocket holes using 2 ½”
(64mm)screws.
CU570 Pure Cube
Outdoor Sauna Assembly Instructions