ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
On the outside, with the sides and front of roof panels
flush to the wall panels, secure the wall panels to the
roof panels using two 2 ½” screws in each wall panel.
10
Lay out the EPMD Membrane over the roof panels.
.
Use a utility knife to cut the excess rubber close to the
edge of the front trim piece.
Repeat for both sides.
CU570 Pure Cube
Outdoor Sauna Assembly Instructions
Once the membrane is laid out evenly, tuck it along the
trim and staple it to the top of the fascia trim.
Continue to staple the membrane down on the 3 sides
that have the trim installed.