Pulsar PSBOC1002435 Скачать руководство пользователя страница 6

www.pulsar.pl 

 

 

 

 

PSBOC1002435 

 

 

 

 

 
 

6

1. Before installation of the power supply unit, make sure that 230VAC power if cut off.  
2. Mount the unit in the intended location.  
3. Connect the 230VAC power cables. Connect the PE cable (yellow-green) to an appropriate PSU 
terminal (marked with 

 - earth symbol). 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 
green wire coat of the power cable shall stick to one side of the ‘PE’ terminal. Using the PSU 
without a properly made and fully operational shock protection circuit is UNACCEPTABLE! 
It can cause a device failure or an electric shock. 
 

 

 

4. Connect load/loads to proper output connectors of the power supply (positive pole is marked as +V, 
negative pole as -V) 
5. Connect the technical outputs to the central or other device. 
6. Connect the battery in accordance with the signs (colours). 
7. Once the tests and operation control have been completed, the enclosure/cabinet can be locked. 

 

 

Fig 3. Mechanical view of the PSU. 

 
3. Operating status indication. 
 

3.1 LED indication 

 

The PSU is equipped with 3 LEDs on the PCB board: 

 - red LED (Fig.2, element 1) normal status (AC power): permanently illuminated. AC power absence is 
indicated by the AC diode going out.  
Caution! LED indicates power absence if the outage lasts >10s. 

 

-  green  LED  (Fig.2,  element  2)  indicates  DC  power  at  the  PSU  output.  Under  normal  status  the  diode  is 
permanently illuminated. In case of a short circuit or an overload, the diode is off. 
 
- green LED  (Fig.2, element 3) indicates battery voltage level. Under normal status (U

BAT

 > 23V) the diode is 

permanently illuminated. In case of decrease of battery voltage (U

BAT

 < 23V) the diode is off. 

 

Содержание PSBOC1002435

Страница 1: ...PSBOC1002435 v 1 1 PSBOC 27 6V 3 5A OC Enclosed buffer switch mode power supply unit with automatic operation control EN Edition 5 from 10 02 2014 Supercedes edition 4 from 30 10 2013...

Страница 2: ...ription 1 1 General description 1 2 Block diagram 1 3 Description of PSU components and connectors 1 4 Specifications 2 Installation 2 1 Requirements 2 2 Installation procedure 3 Operating status indi...

Страница 3: ...output indicating DC absence PSU failure relay type 6 FLB output indicating battery low voltage relay type 7 FAC AC absence technical output OC type 8 FPS output indicating DC absence PSU failure OC...

Страница 4: ...systems 50 mA Battery charging current 0 5A 1A jumper selectable Short circuit protection SCP electronic automatic recovery Overload protection OLP 105 150 of power supply automatic recovery Battery...

Страница 5: ...orage temperature 20 C 60 C Relative humidity 20 90 without condensation Vibrations during operation unacceptable Impulse waves during operation unacceptable Direct insolation unacceptable Vibrations...

Страница 6: ...le as V 5 Connect the technical outputs to the central or other device 6 Connect the battery in accordance with the signs colours 7 Once the tests and operation control have been completed the enclosu...

Страница 7: ...ttery voltage OC type output Under normal status UBAT 23V the output is connected to ground L level 0V In case of decrease of battery voltage UBAT 23V the output is switched into high impedance state...

Страница 8: ...at within 14 days from the delivery to the service centre of the manufacturer 6 The repair period mentioned in item 5 may be prolonged if there are no technical possibilities to carry out the repairs...

Отзывы: