Pulsar PSBEN 5012D Скачать руководство пользователя страница 10

www.pulsar.pl   

 

 

 

PSBEN5012D   

 

 

 

    

BLACK POWER

 

 
 

10 

4.  Installation. 

4.1  Requirements. 

The  PSU  is  to  be  mounted  by  a  qualified  installer,  holding  relevant  permits  and  licenses  (applicable  and  

required  for  a  given  country)  for  ~230 V  in  and  low-voltage  installations.   

As  the  power  supply  is  designed  for  a  continuous  operation  and  is  not  equipped  with  a  power-

switch, therefore, an appropriate overload protection in the power supply circuit should be  provided. Moreover, the 
user should be informed how to disconnect the power supply unit from the mains supply (usually by assigning an 
appropriate  fuse  in  the  fuse  box).      The  electrical  system shall  be  made  in  accordance  with  applicable  standards 
and  regulations.  The    power    supply    should    operate    in    a    vertical  position  in  order  to  provide  free  and  
convectional  air  flow  through ventilating holes of the casing. 

 

4.2  Installation procedure.  

 

 

CAUTION! 
Before installation, cut off the voltage in the ~230 V power-supply circuit. 
To switch off power use an external switch in which the distance between the contacts of all poles in the 
disconnection state is not less than 3mm. 

 

It  is  required  to  install  an  installation  switch  with  a  nominal  current  of  min.  3  A  in  the  power  supply  circuits 

outside the power supply unit. 

 
1. Mount the PSU in a selected location. It is particularly important to bolt the tamper grip to the mounting surface. 
The  grip  is  located  in  the  central  part  of  the  enclosure  (see  fig.  3  [7])  and  guarantees  indication  in  case  of  any 
attempts  of  detaching  the  device  from  the mounting  surface. Proper  installation  is  one  of  the  requirements  of  the 
EN 50131-6 standard. 
 

                                  

 

Fig. 4. Fixing a tamper grip. 

 

2. Connect the power cables (~230 V) to L-N terminals of the PSU. Connect the ground wire to the terminal marked 

by the earth symbol: 

. Use a three-core cable (with a yellow and green protection wire) to make the connection. 

Lead the cables to the appropriate terminals through the insulating bushing.  
 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and green wire coat 

of the power cable shall stick to one side of the terminal - marked with  the  grounding symbol 

  on  

the    PSU  enclosure.  Operation  of  the  PSU  without  the  properly  made  and  fully  operational  shock 
protection circuit is UNACCEPTABLE! It can cause a device failure or an electric shock

 

 
3. Connec

t the receivers’ cables to the +AUX, -AUX connectors of the terminal block on the PSU board. 

4. 

If necessary, connect the device’s leads to the technical inputs and outputs: 

 - EPS FLT; technical output of AC power loss indication (alarm panel, controller, indicator, etc.) 
 - PSU FLT; technical output of the PSU failure. 
 - APS FLT; technical output of the battery failure. 
 - TAMPER; output indicating enclosure opening or detachment from the assembly surface. 
 - EXT IN; input of collective failure. 
5.  With  the 

I

BAT

  jumper  determine  the  maximum  battery  charging  current,  in  accordance  with  the  battery 

parameters.  
6. With the 

P

BAT

  jumper  determine  if  the  discharged  battery  disconnection  system  U<10  V  (+/-5%)  shall  be  on  or 

Содержание PSBEN 5012D

Страница 1: ...PSBEN 5012D v 1 1 PSBEN 13 8V 5A 40Ah EN Buffer switch mode power supply unit Grade 3 EN Edition 9 from 31 01 2019 Supercedes edition 8 from 31 01 2019 LED Version...

Страница 2: ...2 LED Display Dimmer dIS 19 5 3 3 Setting the communication address Adr applies to cooperation with PowerSecurity 19 5 3 4 Setting the transmission speed trS applies to cooperation with PowerSecurity...

Страница 3: ...ww pulsar pl PSBEN5012D BLACK POWER 3 8 TECHNICAL PARAMETERS 30 TABLE 13 ELECTRICAL PARAMETERS 30 TABLE 14 MECHANICAL PARAMETERS 31 TABLE 15 SAFETY OF USE 31 9 TECHNICAL INSPECTIONS AND MAINTENANCE 32...

Страница 4: ...charge protection battery output protection against short circuit and reverse polarity connection jumper selectable battery charging current 0 6 A 1 5 A 2 2 A 3 A remote battery test additional module...

Страница 5: ...ES YES No battery charge YES YES Low output voltage YES YES High output voltage YES YES PSU failure YES YES Surge protection YES YES Short circuit protection YES YES YES YES Overload protection YES YE...

Страница 6: ...tandard Output current 0 66 A 3 A battery charge General use if the PSU is not mounted in an installation complaint with the EN 50131 standard the acceptable current efficiency amounts to 1 Output cur...

Страница 7: ...ACK POWER 7 3 2 Block diagram The PSU is manufactured based on a high duty system of DC DC converter The microprocessor system is responsible for full diagnostics of the PSU and battery parameters Fig...

Страница 8: ...utton disconnection of the PSU during battery assisted operation pin activation of the acoustic indication indication on indication off Caption jumper on jumper off VADJ potentiometer DC voltage adjus...

Страница 9: ...nt no Description Insolation transformer PSU board see Tab 1 fig 2 TAMPER micro switch contacts of tamper resistance NC FMAINS fuse in the supply circuit 230 V L N power supply connector 230 V protect...

Страница 10: ...the enclosure see fig 3 7 and guarantees indication in case of any attempts of detaching the device from the mounting surface Proper installation is one of the requirements of the EN 50131 6 standard...

Страница 11: ...the protection system against complete battery discharge 11 Check the current consumption of the receivers taking into account the battery charging current so as not to exceed the total current effici...

Страница 12: ...g 5 Control panel Table 5 The description of the buttons and LEDs of the LED panel Description Additional information moves the pointer on the screen next screen selection selection approval red LED i...

Страница 13: ...e voltage indicator displays the measured output voltage at the AUX output If the voltage drops below 13 V during operation with activated battery test or exceeds 14 7 V the PSU will indicate a failur...

Страница 14: ...tically displayed if the memory has more failures pressing the OK button will result in displaying subsequent codes the parameter on the display marks the end of the list of failures 5 2 4 Current fai...

Страница 15: ...e code will be automatically displayed if the memory has more failures pressing the OK button will result in displaying subsequent codes the parameter on the display marks the end of the list of failu...

Страница 16: ...Low battery voltage APS FLT the battery voltage has dropped below 11 5 V during battery assisted operation F11 Low battery volt off APS FLT the battery voltage has dropped below 10 V during battery as...

Страница 17: ...bols Symbol Description Additional information Battery test tSt On battery test on OFF battery test off Sections 5 3 1 LED display dimmer On dimmer ON OFF dimmer OFF Sections 5 3 2 Communication addre...

Страница 18: ...your choice with the OK button in order to return to the main menu simultaneously press the rightmost and leftmost buttons on the LED panel Deactivating activating the test with the STOP button on the...

Страница 19: ...mer on OFF dimmer off confirm by pressing OK in order to return to the main menu simultaneously press the rightmost and leftmost buttons 5 3 3 Setting the communication address Adr applies to cooperat...

Страница 20: ...ss parity and speed should have the same settings for both the PSU and the PowerSecurity program The PSU has preset transmission parameters of 115200 baud 8E1 However if it is connected to the network...

Страница 21: ...he panel use the or buttons in order to set the required communication mode 8N2 8E1 factory setting 8O1 confirm by pressing OK in order to return to the main menu simultaneously press the rightmost an...

Страница 22: ...ndicates the PSU failure Under normal status during correct operation the output is close In case of a failure the PSU will switch the output into the open state Any failures can be triggered by the f...

Страница 23: ...ee a correct cooperation between the module and the EXT IN input the VEXT jumper must be on and the connections are to be made accordingly to the diagram below Fig 11 Example of a connection with the...

Страница 24: ...ated by the OVP yellow LED on the PCB board and the PSU FLT output 5 9 PSU overload The PSU is fitted with the LED OVL overload on the PCB and indicator on the LED panel informing about output overloa...

Страница 25: ...s voltage The protection mode is off when the PBAT jumper is removed Caution Deactivating of the UVP function is not recommended since a deep discharge of the battery limits its capability of storing...

Страница 26: ...tery charging time The PSU has a battery circuit charged with direct current The current selection is done with use of the IBAT jumpers The table below shows how long does it take to charge a fully di...

Страница 27: ...onsumption used for the calculation of standby time should be taken into account see section 6 4 7 1 ETHERNET network communication Communication in the Ethernet network is possible due to the additio...

Страница 28: ...www pulsar pl PSBEN5012D BLACK POWER 28 Fig 13 Ethernet network communication using the RS485 INTRE interface...

Страница 29: ...the program into smaller areas depending on the number of monitored power supplies The program is equipped with manager mode which allows the grouping of power supplies for easier analysis and orient...

Страница 30: ...circuit protection SCP Electronic current limitation and or FBAT fuse failure in the battery circuit requires fuse replacement Automatic return Overload protection OLP Program equipment Battery circui...

Страница 31: ...Terminals Supply 0 63 2 50 AWG 22 10 Outputs 0 51 2 AWG 24 12 BAT battery outputs 6 3F 2 5 30cm Notes The enclosure does not adjoin the assembly surface so that cables can be led Convectional cooling...

Страница 32: ...batteries and run the battery test 4 weeks after installation re tighten all screw connections see Fig 2 9 WEEE LABEL According to the European Union WEEE Directive waste electrical and electronic eq...

Отзывы: