background image

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and green 
wire coat of the power cable shall stick to one side of the ‘PE’ terminal. Using the PSU without a 
properly made and fully operational shock protection circuit is UNACCEPTABLE! It can cause a 
device failure or an electric shock. 
 

 

 

7. Connect load/loads to proper output connectors of the power supply (positive pole is marked as +V, 
negative pole as -V) 
8. Connect the battery in accordance with the signs (colours). 
9. Once the tests and operation control have been completed, the enclosure/cabinet can be locked. 
 

 

                   

 

 

 

Fig.2. Diagram of connecting the module to the PSB power supply unit.  

 
 

 

 

 
Fig.3 Diagram of an OC type output.

 

 
Fig.4 Leads in the indication connector.

 

 

Содержание MPSB12

Страница 1: ...te PSU operating status presence of AC voltage presence of DC voltage battery voltage The module is also equipped with technical outputs of AC power loss PSU failure low battery voltage 1 1 Description of the module s components and connectors fig1 tab 1 Table 1 Element no Description 1 LED indicating presence of 230VAC voltage 2 LED indicating presence of DC voltage at the PSU output 3 LED indica...

Страница 2: ...y 20 90 without condensation Storage temperature 20ºC 60ºC Table 3 Dimensions 110 x 44 x 55 LxWxH mm 2 Fixing M3 screws mounting plate adjusted for PSB13 8V series power supplies Connectors Ф0 41 1 63 AWG 26 14 Net gross weight 0 1 0 13 kg 2 1 Requirements The module is to be mounted by a qualified installer holding relevant permits and licenses applicable and required for a given country for 230V...

Страница 3: ...BLE It can cause a device failure or an electric shock 7 Connect load loads to proper output connectors of the power supply positive pole is marked as V negative pole as V 8 Connect the battery in accordance with the signs colours 9 Once the tests and operation control have been completed the enclosure cabinet can be locked Fig 2 Diagram of connecting the module to the PSB power supply unit Fig 3 ...

Страница 4: ...ccepted the manufacturer is obliged to provide warranty repairs at the earliest convenience however not later that within 14 days from the delivery to the service centre of the manufacturer 7 The repair period mentioned in item 6 may be prolonged if there are no technical possibilities to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms b...

Отзывы: