Pulsar HPSB 10A24C Скачать руководство пользователя страница 4

www.pulsar.pl

                                                               

HPSB10A24C                                                    

GREEN POWER

 

 

 

4

 

 

Fig.2. The view of the PSU. 

1.4 Specifications:  

      - electrical parameters (tab.2) 
      - mechanical parameters (tab.3) 
      - operation safety (tab.4) 
      - operating parameters (tab.5) 

 

      

Table 2. Electrical parameters  

PSU type 

A (EPS - External Power Source) 

Mains supply 

176÷264V AC  50Hz 

Current up to 

1,5A@230VAC max. 

Supply power 

276W max.  

Efficiency 

85% 

Power factor PF 

>0,95 @230V AC 

Output voltage 

22V÷ 27,6V DC – buffer operation 
19V÷ 27,6V DC – battery-assisted operation 

Output current t

AMB

<30°C 

9A + 1A battery charge - refer to chart 1 
8A + 2A battery charge - refer to chart 1 
6A + 4A battery charge - refer to chart 1 

Output current t

AMB

=40°C 

6A + 1A battery charge - refer to chart 1 
5A + 2A battery charge - refer to chart 1 
3A + 4A battery charge - refer to chart 1 

Voltage adjustment range 

24

÷28VDC 

Ripple  

150mV p-p max. 

Current consumption by PSU systems 

150mA 

Battery charge current 

1A, 2A or 4A- jumper selectable 

Short-circuit protection SCP 

electronic, automatic return 

Overload protection OLP 

105-150% of the PSU power, automatic return 

Battery circuit protection SCP and reverse  
polarity connection 

melting fuse  

Surge protection 

varistors 

Overvoltage protection OVP 

32V (

activation requires disconnecting the load or 

supply for about 20 s.) 

Excessive discharge protection UVP 

U<19V (

± 5%) – disconnect of connection battery  

Sabotage protection: 
- TAMPER output indicating enclosure opening 

 
- microswitch, NC contacts (enclosure closed), 

Содержание HPSB 10A24C

Страница 1: ...HPSB 10A24C v 1 0 HPSB 27 6V 10A 2x17Ah Buffer switch power supply unit EN Edition 1 from 18 03 2016 Supercedes the edition ...

Страница 2: ... 2 Installation procedure 3 Operating status indication 4 Operation and use 4 1 Overload or short circuit of the PSU output SCP on 4 2 Disconnection of discharged battery 4 3 Maintenance 1 Technical description 1 1 General description A buffer PSU is intended for an uninterrupted supply to devices requiring stabilised voltage of 24V DC 15 The PSU provides voltage of U 27 6V DC Current efficiency 1...

Страница 3: ...ule 2 Connectors PSU L N power supply connector 230V AC Protection connector PE V V DC power output B B battery output 3 green LED indicates AC power 4 P1 potentiometer output voltage adjustment 5 Battery outputs red black 6 TAMPER contact of sabotage protection NC 7 Additional connector for LED indication 8 Selection jumper for charging current Ibat 1A Ibat 2A Ibat 4A Description jumper installed...

Страница 4: ...chart 1 Output current tAMB 40 C 6A 1A battery charge refer to chart 1 5A 2A battery charge refer to chart 1 3A 4A battery charge refer to chart 1 Voltage adjustment range 24 28VDC Ripple 150mV p p max Current consumption by PSU systems 150mA Battery charge current 1A 2A or 4A jumper selectable Short circuit protection SCP electronic automatic return Overload protection OLP 105 150 of the PSU powe...

Страница 5: ...hat cables can be led Forced cooling built in fan Table 4 Operation safety Protection class PN EN 60950 1 2007 I first Protection grade PN EN 60529 2002 U IP20 Electrical strength of insulation between input and output circuits of the PSU I P O P between input circuit and PE protection circuit I P FG between output circuit and PE protection circuit O P FG 3000 V AC min 1500 V AC min 500 V AC min I...

Страница 6: ...The electrical system shall follow valid standards and regulations 2 2 Installation procedure 1 Before installation cut off the voltage in the 230V power supply circuit 2 Mount the PSU in a selected location and connect the wires 3 Connect the power cables 230Vac to L N clips of the PSU Connect the ground wire to the clip marked by the earth symbol PE PSU module connector Use a three core cable wi...

Страница 7: ...ped with the discharged battery disconnection system During the battery assisted operation reducing voltage below 19V at the battery terminals will cause battery disconnection 4 3 Maintenance Any and all maintenance operations may be performed following the disconnection of the PSU from the power supply network The PSU does not require performing any specific maintenance measures however in case o...

Страница 8: ...in 14 days from the delivery to the service centre of the manufacturer 6 The repair period mentioned in item 5 may be prolonged if there are no technical possibilities to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 7 All the services rendered by force of the warranty are carried out at the service centre of the manufa...

Отзывы: