WIL-19230-E-01
Wilden
®
10
Gateway Node
Tools Required:
•
9/64″ Allen Wrench
•
(4) #8-
32 x 1″ Screws
Installation
1.
It is recommended to mount the Gateway Node at least 3
ft. or more from the ground. Additionally, minimize
obstruction between the Gateway Node and Edge Device.
2.
Use the (4) #8-
32 x 1″ Screws and 9/16″ Allen Wrench to
secure the Gateway Node to the monitored equipment.
Use the mounting guide for measurement reference.
3.
There is no importance to the orientation. Once secured,
installation is complete.
4.
Plug in the power adapter, set the antenna facing up
(vertically) and your Gateway Node should now be
installed.
Technical Specifications
The following outlines the technical specifications of the Gateway
Node:
•
Maximum Number of Paired Edge Devices: 10
•
Range: Up to 150 ft.
•
Power Source: 9-24 VDC Powered by External DC Supply
•
Communication:
o
4G LTE Cellular Cloud Connectivity
o
900MHz RF Star-Network Configuration
for Multiple Pumps Connectivity
o
BLE
o
GPS
•
Build
o
IP66 EPDM Rubber Sleeve Protected 20% Glass Reinforced
Polypropylene Enclosure
•
Standards
o
FCC Part 15
o
RoHS Comply
•
Environmental Conditions
o
Temperature: -30°C – 70°C (-22°F – 158°F)
INSTALLATION
Содержание Wilden SafeGuard
Страница 15: ...WIL 19230 E 01 Wilden Notes ...