background image

 

 

15 

10. Operation 

All internal parameters, like required motor torque, actual position, functional status, etc., are being permanently 
monitored during operation of the actuator PS-AMS. This ensures that the actuator positions with optimum 
accuracy, and closes the valve always tight. Deviations can be read out via communication software PSCS or via local 
control PSC.2 (see respective instruction manuals), or can be displayed to the control room using the optional fault 
indication relay. This provides maximum safety of the process.  
 
Cut-offs of the PS-AMS actuators can be adjusted to meet the valve function in an optimum way by using the 
communication software PSCS (using a special interface cable, or optionally Bluetooth connection). This will result in 
different behaviour of the actuator. In case a position is surpassed or not reached, this can be read out via the 
optional Fault Indication Relay or via the communication software PSCS.  

10.1 Cut-off by Force / Torque 

The actuator delivers the programmed maximum force / torque each time when driving to this end position. If the 
closing point inside the valve dislocates, e.g. when a seat gasket wears, then the actuator will drive further in its 
possible actuation range to try to reach the programmed force / torque. 

10.2 Cut-Off by Position automatically 

In normal operation, the actuator will stop at the position which was found at a mechanical stop in the valve or the 
actuator during Automatic Commissioning. If the closing point inside the valve dislocates, the actuator will NOT 
follow this dislocation but it will always stop at the point initially found.  

10.3  Cut-Off by Position 

In normal operation, the actuator will stop at the point which was defined by Manual Commissioning. This position is 
not depending on any mechanical stop inside valve or actuator. 
 

11. Commissioning 

 
The actuator is shipped in the „not commissioned“ condition with the green LED flashing slowly. There will be no 
response to any input (set value or open/close signal). To make the actuator operational, it has to be commissioned 
to a valve. 
 
Depending on the type of cut-offs programmed (see 10.1), there are two ways to do commissioning: 
 
 - Automatic commissioning is done if at least one of the cut-offs is set to be “by force/torque” or “by position 
automatically”.  
 - Manual commissioning has to be made in case both cut-offs are “by position”, either via software PSCS or via 
control box PSC.2.  

 

 

 

 

 
 
 
11.1 Automatic Commissioning 

This is performed if at least one of the cut-offs is set to be “by force/torque” or “by position automatically”. 

Caution! 
Electrical operation of the actuator is allowed only after mounting to a 
valve! 
To avoid injuries due to live or rotating components, commissioning is 
allowed only while the main cover of the actuator is closed. 
 
Attention! Observe precautions for handling. Electrostatic sensitive 
devices. 
 
 

Содержание PS-AMS PSQ Series

Страница 1: ...Operating Instructions PS AMS Series PSQ Version 2018 11 19 2018 PS Automation GmbH Subject to changes...

Страница 2: ...ace optional 13 8 4 Accessories 13 8 4 1 Space Heater optional 13 8 4 2 Adjusting Additional Position Switches optional 13 9 Status Display Operating Element Communication 14 9 1 Status LEDs 14 9 2 Co...

Страница 3: ...these Operating Instructions must be followed for all work pertaining to the installation commissioning operation change of operating conditions and modes maintenance inspection repair and installatio...

Страница 4: ...t is familiar with them and informed about potential hazards The specific regulations for the prevention of accidents have to be observed Damages caused by unauthorized modifications carried out on th...

Страница 5: ...tuators in environments with high temperature fluctuations or high humidity we recommend using a heating resistor as well as a higher enclosure rating optional accessories Actuator type A B C D E F G...

Страница 6: ...ee chapter 6 Manual Operation except when using the fail safe unit PSCP 6 Manual Operation A hand wheel is provided to operate the actuator in case of power failure or for valve adjustment PSQ AMS act...

Страница 7: ...the valve shaft The drive bush 2 has an indicator tooth 3 or a marking hole 4 which clearly defines the position of the drive bush There also is a corresponding marking at the actuator recess or colo...

Страница 8: ...vices must be conform to the standard IEC 364 4 41 protective class I resp DIN IEC 60364 4 44 according to the overvoltage category of the actuator Please protect all of the power supply and control c...

Страница 9: ...ng diagram Wiring to the terminal box Figure 9 Open the terminal box Open the cover of the terminal box Insert the cable through the cable glands to the inside of the cover Figure 10 Plug modules Unsc...

Страница 10: ...ring diagram for wiring to the main board Figure 12 Electrical terminals with local control PSC 2 with 1 phase AC DC The wiring diagram with Fieldbus and the above mentioned wiring diagrams are suppli...

Страница 11: ...ver of the terminal box Figure 14 Close the cover After wiring is completed put on the cover properly tighten the 4 screws crosswise and tighten the cable glands After connecting all the required wire...

Страница 12: ...rminals 12 and 13 main board resp 25 and 26 terminal box allows to drive the actuator to a parameterised safety position by applying a voltage of 24 V to 230 V 8 3 3 Output Terminals 8 3 3 1 Active Po...

Страница 13: ...ver contacts for currents between 10 mA and 5 A at maximum 230 V Special switches with gold plated contacts for low power up to 100 mA and 30V are available on request Connection goes to terminal X6 o...

Страница 14: ...the automatic commissioning run to adjust the actuator to the valve is located beside the LEDs See chapter 10 1 Cut off in end positions and 11 1 2 Commissioning Procedure Figure 21 Communication por...

Страница 15: ...n the actuator will stop at the position which was found at a mechanical stop in the valve or the actuator during Automatic Commissioning If the closing point inside the valve dislocates the actuator...

Страница 16: ...llen screw for CLOSED position Item 2 Allen screw for OPEN position Item 3 protective caps 11 1 2 Commissioning Procedure When adjusting a mechanical stop drive the actuator only by hand wheel not ele...

Страница 17: ...ning procedure The automatic commissioning run start now The actuator will drive through the full adjusted range The green LED flashes quickly during this commissioning run After finishing it the actu...

Страница 18: ...f the valve will be calculated in accordance with the programmed valve stroke After manual commissioning the actuator is ready for use The green LED is glowing permanently Note If the parameterised va...

Страница 19: ...d Fail Safe PSCP Emergency power supply based on supercapacitors safety position OPEN CLOSED or free defined position Fieldbus Interface Digital transmission of nominal and actual value per mill or pe...

Страница 20: ...rocess sensor x x Actuator position does not correspond to set value input A non linear valve curve has been parameterised Verify parameterised characteristic see instructions AMS PSCS Operating condi...

Страница 21: ...end position has been passed over Valve seat worn or defective Check the valve seat x x Actuator supply voltage too low 1 Improper wiring of the mains supply 2 Jitter in supply voltage 3 Too low supp...

Страница 22: ...22 16 CE Declaration of Conformity...

Страница 23: ...23...

Страница 24: ...o de Correos 142 E 43480 Vila Seca Tarragona Tel 34 9 77 39 11 09 Fax 34 9 77 39 44 80 E mail hans sertemo com www sertemo com Hong Kong MaxAuto Company Ltd Room 2008 20 F CCT Telecom Building 11 Wo S...

Отзывы: