background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

8

are located in the lower left corner of the bearing frame (frontal view). We also mount an external protective terminal
(brass M6 screw).

The paint has to be removed from the surface around the screw inside the case and on its outer side before fitting

of the protective terminal. We connect a protective conductor ended with a cable lug under the head of the screw
inside the case. On the outer side we tighten a brass nut with a fan-shaped washer. The second nut is used for
connection of the external protective conductor.

Simple and also more complicated regulation elements such as programmable indoor temperature controllers

(daily or weekly programme) are available at the PROTHERM electrical boilers company and through its contract
partners. For proper operation of PROTHERM electric boilers it is necessary to install controllers with zero output
voltage. The required current carrying capacity of output contacts of the controller is 230 V / 0,1 A. Indoor temperature
controllers with zero potential output are connected to RT terminals.

6.2. Cascade control

If the output of the boiler does not cover the heat loss of the building, there is a possibility to connect another heat

source to boilers of the 21 and 24 series. To enable so-called cascade control connect K 1 and K 2

  

terminals of the

controlling boiler with the PR 1 and PR 2 terminals of the controlled boiler. If there is a need for cascade control,
ensured by the spatial thermostat, we connect its control terminals with the PR 1 and PR 2 terminals of the controlling
boiler.

7. Operations

After connection of the electric boiler to the heating system (according to local conditions) the system is filled with

soft water  and the tightness of the entire system is checked simultaneously. Additional sealing is made if necessary.

 After completing installation, the operating thermostat function is checked along with the thermal cut-off, pressure

switch and control elements on the panel.

Note

: Before the initial start-up of the boiler it is necessary to set the boiler operating thermostat to the minimum

level, due to undesirable air intake. After the switch-on of the main switch of the boiler (the green signal light is lit)
and after checking the active function of the general remote control turn the operating thermostat of the boiler until
the LED diode of the first output level is lit. Subsequently, turn the operating thermostat back to the minimum level.
This will activate the after-running function of the pump with a duration of 2 minutes. It is recommended to repeat
this two times.

If the orange signal light is on, then the boiler has probably overheated or there was a water pressure drop in the

boiler. In the first case a professional service engineer should check the emergency thermostat above the control

panel, see pic.

 7

.

 The emergency thermostat is irreversible, so the failure has to be deblocked by a deblocking

button (a). In the second case there was a water pressure drop in
the boiler. This can be only solved by filling the system with water,
until the water pressure rises above 1 bar. The orange signal light is
then switched off.

Before an any check into an inside part of the electric boiler relevant

to parts which are in a contact with a water or a wiring it

ś

 necessary

to fill following conditions:

-

to switch off the boiler by means of the room thermostat or
the operating thermostat

-

to wait for c. 2 minutes

-

to disconnect the boiler from off the pernament input
connection of mains (a circuit breaker)

-

to close valves under the boiler (inlet, outlet)

-

to drain a water from the boiler (drain cock)

After a finish of the control or a possible revision check before the
repeated switching of the electric boiler to the mains, if the water
doesn´t issue out of the boiler.

Diagram 7

Содержание RAY 9-24K

Страница 1: ...Supplied By www heating spares co Tel 0161 620 6677 14 User and installation instructions for direct heating electric boiler RAY 9 24K y...

Страница 2: ...4 4 Conditions for installation and operation 5 5 Boiler connection dimensions and pump characteristics 6 6 Mounting and placement of the boiler 7 6 1 Wiring 7 6 2 Cascade control 8 7 Operations 8 8 M...

Страница 3: ...ed in the operating instructions and carry out everything in accordance with them 8 Do not remove or damage any labels or written notices on the boiler 9 The boiler complies with the following standar...

Страница 4: ...he REJNOK series boilers are designed for mounting on a wall In order to achieve higher output the electric boilers can be cascade connected and controlled by only one temperature controller connected...

Страница 5: ...um heating water temperature depends on the type of heating system floor heating fitting of thermostatic heads heating of hot water Please set the indoor temperature controller according to the user i...

Страница 6: ...boiler and a proof check are demonstrated on a Diagram 3 Provision of warranty is conditioned by professional installation carried out by an authorized service company Therefore please contact our co...

Страница 7: ...connection dimensions and pump characteristics Boiler connection description 1 a cable bushings 2 filling draining 1 2 3 a heating water inlet 3 4 4 overflow of a safety valve 5 a heating water outlet...

Страница 8: ...r distribution system several times with pressure water Older already used systems should be flushed in the direction which is opposite to the direction of the heating water In new systems all heating...

Страница 9: ...ditional sealing is made if necessary After completing installation the operating thermostat function is checked along with the thermal cut off pressure switch and control elements on the panel Note B...

Страница 10: ...the expansion tank and refill the lost water 9 Complete supply of parts The electric boiler is supplied in an assembled state The connecting wires for the electric boiler and connecting wires for the...

Страница 11: ...4 Filling draining opening G 1 2 Dimensions height mm 745 width mm 410 depth mm 240 weight without water kg 34 Efficiency 99 5 Max operating temperature of the heating water C 85 Max delivery of the...

Страница 12: ...620 6677 11 13 Boiler wiring diagram TS pressure switch 0 8 Bar HT over heat thermostat 100 C PT operating thermostat max 85 C PR1 PR2 room thermostat 230 V 0 1 A HDO ripple control S HDO RC contactor...

Страница 13: ...Z For a correct communication between the boiler and the DHW tank it necessary to fill following conditions which relate to a pic on the page No 13 Assembly conditions to a distribution a heating wate...

Страница 14: ...ontrol voltage 230 AC at the interconnection the electric boiler with the DHW tank it always necessary made it in accordance with conditions in user and installation instructions TS pressure switch 0...

Отзывы: