background image

Arm

"a"

"a"

Lock with spring

Lock with spring

"b"

"c"

Properly folded beam

Pillar socket

Lock with spring

Beam arm

Beam locking position.

"d"

"e"

Beam arm

Pillar socket

Lock with spring

"d"

"e"

"f"

PREPARATION OF THE BEAM

Open both arms of the foldable beam - step "a".

1.

Pull back the locking finger - step "b", and fully open the arm - step "c". Locking finger should move back automatically. 

2.

Repeat sequence for second arm.

To unlock the arm pull back the locking finger and close the arm. 

3.

PILLAR'S INSTALLATION / ADJUSTING

Pull back locking finger installed on the bottom of the pillar socket - step "d".

1.

Insert beam arm to the desired depth and lock on one of the nine positions (locking finger should move 

2.

back automatically) - steps "e" and "f".

To remove the arm from pillar pull back the locking finger and pull out the arm from the pillar socket.

3.

3/7

Содержание AT 252

Страница 1: ...c Pillar B Brake winch RUP502 T for lifting loads sold separately Device is made of powder painted steel Each Pillar is equipped with locking pin with spring for quick beam installation Foldable beam for easier transport consist of centrally installed wheel for working rope guidance and two arms with 9 pcs of locking holes for proper adjustment to the well The beam in the working position is prote...

Страница 2: ...ip Bolts from RUP502 T grip RUP502 T BRAKE WINCH INSTALLATION Remove grip from RUP502 T brake winch according to RUP5 2 T Instruction manual Removing the grip fo the 1 RUP502 T device Install winch without grip to the plate on Pillar A using the same bolts and nuts 2 2 7 ...

Страница 3: ...step c Locking finger should move back automatically 2 Repeat sequence for second arm To unlock the arm pull back the locking finger and close the arm 3 PILLAR S INSTALLATION ADJUSTING Pull back locking finger installed on the bottom of the pillar socket step d 1 Insert beam arm to the desired depth and lock on one of the nine positions locking finger should move 2 back automatically steps e and f...

Страница 4: ...e well Pillar limiter Pillar limiter Pillar limiter Pillar limiter h h h h ANCHOR BEAM INSTALLATION ON THE CONCRETE WELL Adjust pillars spacing so that the pulley was near the center of the concrete well step g 1 Pillar limiters should be located as close as possible to the outer well surface step h 2 g 4 7 ...

Страница 5: ...s operate the winch with hand power and with crank included in the equipment only Before each use a thorough inspection must be carried out Inspection must be carried out by a person using the device In the case of damages and malfunctions the device should be withdrawn from use Nevel allow to full extension of the working rope from the winch reel Keep at least three rope coils on the reel it is m...

Страница 6: ...to check the device condition and proper operation Carefully check all elements paying particular attention to any damage excessive wear corrosion abrasion cuts and malfunction At least once a year after 12 months of use the device should be withdrawn from use for a detailed interim inspection The inspection can be carried out by the person responsible in the workplace for the interim inspections ...

Страница 7: ...IPMENT S WITHDRAWN FROM USE SHALL BE NOTED THE IDENTITY CARD SHOULD BE STORAGED DURING A WHOLE PERIOD OF EQUIPMENT UTILIZATION DO NOT USE THE EQUIPMENT WITHOUT THE IDENTITY CARD PRODUCER PROTEKT 93 403 LODZ ul Starorudzka 9 POLAND tel 48 42 680 20 83 fax 48 42 680 20 93 www protekt com pl MODEL AND TYPE OF EQUIPMENT REF NUMBER SERIAL NUMBER DATE OF MANUFACTURE DATE OF PURCHASE DATE OF FIRST USE US...

Отзывы: