
V1.0_2021-05-17
PROGNOST XP, XPE, XPE-Akku
Instructions for use
5038-0-0002
27 of 51
To operate the PROGNOST XPE-Akku, a charged battery box must be inserted into the supply station of
the table.
CAUTION!
Before changing the battery box, press the emergency stop switch of the
PROGNOST XPE-Akku and only after a fully charged battery box has been
inserted, put the device back into operational readiness by releasing the
emergency stop switch.
The second batter box is charged with the battery box charging station.
CAUTION!
The batter boxes may only be charged with the PROTEC approved charger!
The 20A fuse protecting the 12VDC voltage in the PROGNOST XPE-Akku behind the cover of the power
supply station is accessible through the battery box slot.
CAUTION!
The battery box has recessed contact surfaces at the bottom for the 12VDC
supply connections to the installed battery.
Never short-circuit the contact surfaces!
Never place a battery box on a metal plate, metallic or conductive objects,
otherwise there is a risk of short-circuiting the built-in battery!
Charging socket
12VDC contact area
Fuse 20A