![pronovost SilaTube P-6500 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/pronovost/silatube-p-6500/silatube-p-6500_operator-and-parts-manual_1617538020.webp)
- 20 -
4
OPERATION (cont'd)
HEIGHT ADJUSTMENT OF THE MOBILE ARCH
Bag installation
Work position
1 BALE: 4' high x 8' long
GROUND PREPARATION
1) Choose a dry and well drained area.
2) Level and clean up site where the tubes will be
used.
3) If possible, provide a sand bed of 2" to 3" (5-8 cm)
thick (Fig. 40). This will help reduce damage from
rodents.
Figure 40
Figure 39
Содержание SilaTube P-6500
Страница 1: ...SilaTube Model P 6500 No C1856 01 07 OPERATOR S PARTS MANUAL...
Страница 2: ...Copyright Les Machineries Pronovost Inc 2007 All rights reserved Printed in Canada...
Страница 4: ......
Страница 28: ...28 SILATUBE P 6500 ASSEMBLY 8 170 02893R1...
Страница 40: ...40 HYDRAULIC DOUBLE PUMP ALPA2A D 16 ALPP2 D FA 8 170 04381 TIF...
Страница 44: ...44 HYDRAULIC SYSTEM 8 170 02913...
Страница 47: ...47 ELECTRIC SYSTEM 8 170 00441...
Страница 53: ......
Страница 54: ......
Страница 55: ......