SECTION 4
Pronar PT608
4.21
FIGURE 4.4
Chute
(1) chute slide gate, (2) chute, (3) lever, (4) locking bolt
The rear load box wall is equipped with the chute slide gate (1) – figure (4.4) and chute
opening (2) (additional equipment) for unloading bulk materials. Chute design allows very
accurate dosing of the material to packaging (sacks, boxes etc.). The opening gap can be
controlled using lever (3). In order to do that loosen the bolt interlocking slide gate (4), open
the slide as required and lock again using the bolt. When unloading through the chute do not
open wall locks or wall extension locks and tipping of the load box must be done very slowly
and without jerking. Raising the load box quickly will exert large pressure on the rear part of
the load box due to displacement of the carried material and could compromise trailer's
stability.
While unloading bulky materials be especially careful. Do NOT tip load box on uneven or wet
ground and move and jerk trailer during unloading. Bulky materials are normally difficult to
Содержание PT610
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 26: ...Pronar PT610 SECTION 1 1 16 ...
Страница 27: ...SECTION 2 SAFETY ADVICE ...
Страница 44: ...Pronar PT610 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Страница 45: ...SECTION 3 DESIGN AND OPERATION ...
Страница 60: ...Pronar PT610 SECTION 3 3 16 FIGURE 3 11 Electrical system diagram Marking according to table 3 2 3 3 and 3 4 ...
Страница 63: ...SECTION 4 CORRECT USE ...
Страница 87: ...SECTION 5 MAINTENANCE ...
Страница 117: ...SECTION 5 Pronar PT610 5 31 FIGURE 5 12 Trailer s lubrication points part 2 ...
Страница 129: ...NOTES ...
Страница 130: ... ...