SECTION 5
Pronar PT610
5.23
Reinforcing sleeve (4) of the conduit must be thoroughly depressed.
Check tightness of connections in accordance with Chapter (5.3.2).
FIGURE 5.10 Installation of pneumatic conduit
(1) pneumatic conduit, (2) connecting nut (3) clamping ring, (4) reinforcing sleeve
5.4
HYDRAULIC SYSTEM MAINTENANCE
5.4.1 PRELIMINARY INFORMATION
Work connected with the repair, change or regeneration of hydraulic system components
(tipping cylinder, valves etc.) should be entrusted to specialist establishments, having the
appropriate technology and qualifications for this type of work.
The duties of the operator connected with the hydraulic system maintenance include:
•
checking tightness and visual inspection of the system,
•
checking technical condition of hydraulic connections.
Содержание PT610
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 26: ...Pronar PT610 SECTION 1 1 16 ...
Страница 27: ...SECTION 2 SAFETY ADVICE ...
Страница 44: ...Pronar PT610 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Страница 45: ...SECTION 3 DESIGN AND OPERATION ...
Страница 60: ...Pronar PT610 SECTION 3 3 16 FIGURE 3 11 Electrical system diagram Marking according to table 3 2 3 3 and 3 4 ...
Страница 63: ...SECTION 4 CORRECT USE ...
Страница 87: ...SECTION 5 MAINTENANCE ...
Страница 117: ...SECTION 5 Pronar PT610 5 31 FIGURE 5 12 Trailer s lubrication points part 2 ...
Страница 129: ...NOTES ...
Страница 130: ... ...