Pr
o
Minent
®
Page 5
Table of Contents
6
Operating errors, help, troubleshooting
......................................................................
46
6.1
Consequences of operating errors .................................................................................. 46
6.1.1
Incorrect setting of metering pumps .................................................................... 46
6.1.2
Incorrect setting of flow monitor (ring initiators) ................................................... 46
6.1.3
Incorrect setting of air bleed taps (acid, chlorite and water) ................................ 47
6.1.4
Incorrect use of control ........................................................................................ 47
6.2
Malfunctions .................................................................................................................... 47
6.2.1
Malfunctioning of metering pumps ...................................................................... 47
6.2.2
Error messages at control .................................................................................... 47
7
Inspection and maintenance
........................................................................................
49
7.1
Safety requirements, safety information .......................................................................... 49
7.2
Maintenance of overall system ........................................................................................ 49
7.2.1
Maintenance and service for the Bello Zon
®
Reactor;
removing and detoxifying reactor content ........................................................... 49
7.2.2
Maintenance of metering pumps ......................................................................... 50
7.3
Maintenance intervals, lifetime of system ....................................................................... 50
8
Mounting and dismantling chlorine dioxide systems
.................................................
51
8.1
Mechanical and hydraulic installation of system ............................................................. 51
8.1.1
Hydraulic connections .......................................................................................... 51
8.1.2
Metering pump intake lances or intake fittings for acid and chlorite ................... 52
8.1.3
Dilution water tank and water metering pump ..................................................... 53
8.1.4
Reactor space venting ......................................................................................... 53
8.2
Electrical installation of the system ................................................................................. 53
8.2.1
Control ................................................................................................................. 53
8.2.2
Connections at distributor box ............................................................................. 54
8.3
Dismantling the chlorine dioxide system ......................................................................... 54
8.4
Disposal of used parts ..................................................................................................... 54
9
List of Illustrations
.........................................................................................................
55
EC Declaration of Conformity
..................................................................................................
56
Содержание Bello Zon CDKa 10000
Страница 57: ...ProMinent Page 57...