background image

MAINTENANCE MANUAL //

 STRETCHER PC-750 + RAIL PB-720

Revision 2021/10

7

4.1 STRETCHER

4.1.1 CONTROL PANEL:

 

Check the condition of the membrane and consider whether it needs to be replaced. It should be con-

sidered that the membrane is an element that suffers a lot of wear and if it is in bad condition it could 

have a fault. If it is in poor condition, it is recommended to change it before it stops working as otherwi-

se it could compromise a service.

4.1.2 LOWER STRUCTURE:

 

Check the condition of the reflective stickers and consider whether it is necessary to replace them.

 

Check the condition of the adhesives and consider whether it is necessary to replace them

4.2 RAIL

4.2.1 FIXED RAIL OPERATION:

 

Check the condition of the adhesives and consider whether it is necessary to replace them.

4.2.2 FIXED RAIL OPERATION:

 

Check the condition of the adhesives and consider whether it is necessary to replace them.

4.1.3 LEGS:

 

Make sure that the rotation shaft bolts are properly tightened.

 

Check the tightening torque of the screws that connect the legs 

to the upper part of the stretcher (see Fig. 8). The tightening tor-

que must be 19.11 Nm.

 

Make sure that the limit switch sensor is properly tightened and 

fixed.

 

Clean the upper and lower guides and renew the lubrication with 

Vaseline. IMPORTANT: after greasing, always clean the excess.

 

Check the condition of the adhesives and consider whether it is 

necessary to replace them.

4.1.4 PROFILE:

FIGURE 8

04 

EVERY 3 YEARS

Содержание PB-720 Series

Страница 1: ...MAINTENANCE MANUAL ELECTRIC STRETCHER SERIES PC 750 RAIL SERIES PB 720 Revision 2021 10...

Страница 2: ...e screws on both sides of the lower structure see Fig 1 The tightening torque must be 19 11 Nm Clean the guides on both sides and renew the lubrication with Vaseline see Fig 2 IMPORTANT after greasing...

Страница 3: ...ee Fig 4 Check that all the elements screwed on top of the rail are fixed central hooks front lock loading head etc Open the manhole covers clean and grease the lateral move ment guides with Vaseline...

Страница 4: ...tor when raising and lowering the stretcher and confirm that it is working well without exerting any extra effort 2 1 5 LOADING HEAD Check the return of the load terminals of the head press each of th...

Страница 5: ...nt is not correctly assembled it could cause damage during use in which case the Promeba technical service should be contacted to consider whether it needs to be replaced Check that the screws that co...

Страница 6: ...ery two years or according to wear Check the condition of the telescopic lever handles and their inner profiles and consider whether they need to be replaced These elements must be replaced every two...

Страница 7: ...r it is necessary to replace them 4 2 RAIL 4 2 1 FIXED RAIL OPERATION Check the condition of the adhesives and consider whether it is necessary to replace them 4 2 2 FIXED RAIL OPERATION Check the con...

Страница 8: ...derecho ha modificaciones sin previo aviso Promeba S L no se considera responsabe de los da os causados por la falta o la inexactitud de la informaci n aqu mencionada All rights reserved Variations ca...

Отзывы: