Roof Section Stages
Roof Section Stages
1m Wide
Repeat previous roof
section fixing stages
115mm Metal
Roof Screws
* Use Step ladder when
fixing the roof sections,
2 people are required.
ID: 21140
Roof Section Stages
1m
Wide
Position the last roof
section. Secure with
metal screws.
115mm Metal
Roof Screws
* Use Step ladder when
fixing the roof sections,
2 people are required.
Side
Back
ID: 21140
Roof Section Stages
1m Wide
Only 1 screw is required
to hold the back in place
in this stage.
Position the 1m wide roof
section and slot it into the
first roof section. Fix in place
with metal roof screws
115mm Metal
Roof Screws
ID: 21140
Barge Board Flashing Stages
Position the Barge Board Flashing
on both side of roof sections. Fix
the flashing through the top ridge
of the metal roof.
2927mm
115mm Metal
Roof Screws
ID: 21177
Back
Side
Side
Front
Barge Board Flashing Stages
115mm Metal
Roof Screws
Back
Position the Water Deflector
Flashing and fix through
the top ridge of metal roof.
L2530mm x 2
The screws already in
the roof will need to be
removed before the
flashing fitted.
Flashing
overlap
Water Deflector Flashing Stages
ID: PT21169
68
71
72
73
69
70