Base Module Stages
Side
Front
Gable Bearers are fitted on each side of
fully assembled base. This gives extra
room for the floor sections. (see diagram)
Pilot drill holes
before fixing
Base Module fixing
70mm
Screws
Floor Joist
Floor Boards
Side of
Base Module
Plinth
Gable
Bearer
Base Module fixing
Side
Front
Back
Position the gable bearers each side to
the fully assembled base. Secure with
70mm screws
Base Module fixing
70mm
Screws
ID: PT25398
Check the base module can sit level to the
ground. Use spirit level when leveling all
corners of the base.
Base Module fixing
Side
Front
Base Module fixing
Side
Front
Side
Front
Back
Ensure the ground must be flat and level,
before laying the base module assembly.
Base Module fixing
4
7
8
9
5
6