12
STEP 5 (See Diagram 5)
A.
Place the Left Upper Frame (#94) onto the Front Top Beam (#15). Secure it with two M10 x
3 1/8” Carriage Bolts (#77), one 5 1/8” x 2 3/8” Bracket (#35), two Ø
¾
” Washers (#66), and
two M10 Aircraft Nuts (#86).
B.
Secure the Left Upper Frame (#94) to the Rear Upper Frame with two M10 x 2
¾
” Carriage
Bolts (#75), one 4
¾
” x 2
¾
” Bracket (#101), two Ø
¾
” Washers (#66), and M10 Aircraft
Nuts (#86).
C.
Insert a Cross-Over Swivel Pulley Bracket (#99) into the sleeve on the Left Upper Frame.
Secure it with one Ø 7/8” x 5/8” Bushing and two M6 x
¼
” Allen Screws (#106).
D.
Repeat procedures A, B and C above to install the Right Upper Frame (#95). Place a Pulley
(#57) in the opening on the Rear Upper Frame (#9). Secure the Pulley, the rear of Left &
Right Upper Frames (#94 & 95), and the Rear Upper Frame (#9) all together with one M10 x
3 3/8” Allen Bolt (#73), two Ø
¾
” Washers (#66), and one M10 Aircraft Nut (#86).
DIAGRAM 5
11
Содержание PRG-9010G
Страница 9: ...9 DIAGRAM 2...
Страница 14: ...14 CABLE LOOP DIAGRAM 6...
Страница 17: ...17 DIAGRAM 8 CABLE LOOP DIAGRAM 8...
Страница 19: ...19 DIAGRAM 9...
Страница 22: ...22 EXPLODED DIAGRAM...
Страница 30: ...30...