Thorough

  

leakage

 

detection

  

using

 

a

 

suitable

 

detector

  

should

 

be

 

carried

 

out

 

on

 

the

 

condenser

  

unit.

 

After

 

these

 

tests,

 

the

 

gas

 

must

 

be

 

removed.

  

Fit

 

the

 

drier

 

cartridges

  

in

 

their

 

casing. 

 

Dehydration

 

of

 

circuits 

This

 

operation

  

must

 

be

 

carried

 

out

 

with

 

all

 

valves

 

open

 

(including

  

solenoid

 

valves)

 

with

 

connection

  

to

 

a

 

vacuum

 

pump: 

of

 

the

 

low

 

pressureside 

of

 

the

 

high

 

pressureside 

 

The

  

quality

  

of

 

drying

  

should

  

not

  

be

  

judged

  

by

  

the

  

speed

  

at

  

which

  

the

  

level

  

of

 

vacuum

  

is

 

reached

  

but

  

on

 

the

  

effective

  

time

  

it

 

is

 

held

  

(24

  

hours

  

at

  

0.7

  

mbar

  

is

 

a

  

good

  

standard). 

The

 

total

 

increase

  

in

 

pressure

  

during

 

that

 

period

 

should

 

not

 

be

 

more

 

than

 

2.6

 

mbar.

 

The

 

residual

 

moisture

  

in

 

the

 

system

 

should

 

be

 

less 

than

 

20ppm. 

When

 

the

 

installation

  

is

 

under

 

vacuum,

 

an

 

insulation

  

check

 

of

 

the

 

motor

 

should

 

not

 

be

 

carried

 

out

 

nor

 

should

 

the

 

compressors

 

be

 

started

 

before

 

at

 

least

 

1

 

bar

 

of

 

fluid

 

pressure

  

is

 

reintroduced. 

This

 

is

 

to

 

prevent

 

motor

 

winding

 

damage. 

Oil

 

level

 

checks 

After

 

a

 

minimum

 

of

 

2

 

hours

 

of

 

operation,

 

check

 

the

 

oil

 

compressor

  

levels.



 

1/2

 

sight

 

glass

 

working.

 

Levels

 

should

  

never

  

exceed

  

the

 

manufacturers’

 

recommendations. 

WARNING:

  

Optional

  

Oil

  

separator

  

is

 

mounted

  

without

  

oil

  

charge.

  

Complement

  

must

  

be

  

added

  

by

  

installer

  

during

  

commissioning. 

 

Oils 

The

 

compressor

 

Manufacturer's

 

recommendations

 

should

 

be

 

followed

 

according

 

to

 

the

 

type

 

of

 

refrigerant.

 

The

 

use

 

of

 

colorants

 

or

 

UV

 

tracers

 

as

 

leak

 

detectors

 

in

 

the

 

oil,

 

is

 

not

 

allowed. 

 

Oil 

Refrigerant 

Mobil

 

Arctic

 

EAL

 

22

 

CC

 

ICI

 

Emkarate

  

RL32CF 

R134a

 

/

 

R407F

 

/

 

R404A/

 

R507 

This

 

table

 

is

 

not

 

exhaustive,

  

but

 

summarises

  

the

 

principal

  

oils

 

used.

 

If

 

any

 

other

 

oil

 

is

 

to

 

be

 

used,

 

we

 

would

 

advise

 

contacting

  

PROFROID 

or

 

the

 

compressor

  

manufacturers. 

Refrigerant 

 

fluid

   

charge 

It

 

is

 

possible

 

to

 

charge

 

in

 

liquid

 

phase

 

when

 

the

 

installation

  

is

 

under

 

vacuum

 

through

  

the

 

charging

  

valve

 

provided

  

on

 

the

 

liquid

 

receiver 

(depending

  

on

 

models). 

 

The

 

charging

  

bottle

 

must

 

remain

 

connected

  

to

 

this

 

valve

 

permanently

 

during

 

the

 

whole

 

start-up

  

period

 

to

 

enable

 

instant

 

adjustment

  

while

 

charging

  

the

 

installation 

Fan 

 

checks 

Direction

  

of

 

rotation 

Check

 

that

 

the

 

fan

 

is

 

rotating

 

in

 

the

 

correct

 

direction,

 

Suction

 

on

 

the

 

coil. 

Pre-Setting

 

of

 

Control

 

Systems 

-

 

Pre-set

 

the

 

LP

 

regulation

 

pressure

 

switch

 

and

 

test

 

manually. 

-

 

Pre-set

 

the

 

fans

 

speed

 

control. 

The

 

condensing

  

pressure

  

is

 

regulated

  

through

 

the

 

fans

 

speed

 

control

 

that

 

fluctuates

  

speed

 

of

 

the

 

fan

 

motors

 

according

  

to

 

the

 

setting

 

chosen. 

 

Device

 

Fonct.

 

Fluid

 

Applic.

 

Pre-set

 

 

 

LP 

pressure 

switch

 

 
 
 

Comp. 

Safety 

 

 
 

R404A 
R507

 

R407F

 

 

 

Medium

 

 

Cutting : 1,5 bar

 

 

Engagement :3 bar

 

 

Low

 

Cutting : 0,3 bar

 

 

Engagement :1,0 bar

 

 

Device

 

Fonct.

 

Fluid

 

Applic.

 

Pre-set

 

 

LP 

pressure 

switch

 

 
 

Comp. 
saferty 

 
 
 

R134a

 

 

 

Medium

 

Temp

 

 

 
 

26 

 

Cutting:  0.3 bar

 

 
 

 

Engagement  :1,0 bar

 

Содержание QUIETOR GQH-GQL

Страница 1: ...L Il est imp ratif de prendre connaissance de ces instructions d s r ception de l appareil et avant toute intervention sur celui ci Notre service technique reste votre enti redisposition au 33 04 42 1...

Страница 2: ...modification s ou de r paration s de ses appareils sans son accord pr alable Les appareils sont exclusivement destin s des professionnels pour un usage en r frig ration et pour leurs limites d utilis...

Страница 3: ...de frigorig ne S assurer que les flexibles ne sont pas en contact avec des parties m talliques Les produits ajout s pour l isolation thermique et ou acoustique doivent tre neutres vis vis des mat riau...

Страница 4: ...v rification absence de tension Ne pas utiliser les tuyauteries comme moyen d acc s ou moyen de stockage Le remplacement d une soupape de s curit s effectuera par le m me mod le et la m me marque que...

Страница 5: ...KVR KVD viter tout contact entre la peau et le joint torique Pour les composants DANFOSS ETS KVS SGN SGP Eviter tout contact entre la peau et le papier Eviter de respirer la poussi re issue du papier...

Страница 6: ...rned off The contractor or the company in charge of the installation shall be responsible for carrying out the required instructions Profroid disclaims any responsibility for change s or repair s on i...

Страница 7: ...must be neutral with respect to support materials The protection devices pipings and accessories must be protected against unfavourable effects from the environment Make sure that access and emergency...

Страница 8: ...the possible increase of pressure in the part of device which isisolated The periodic technical checks must be made following frequencies determined by standards sound engineering practice end user an...

Страница 9: ...KVR KVD avoid any contact between the skin and the O ring Concerning the DANFOSS components ETS KVS SGN SGP Avoid any contact between the skin and the paper Avoid to breathe dust that might come from...

Страница 10: ...eiten ausf hrt daf r zu sorgen dass dies beachtet wird ProFroid kann f r nderungen oder Reparaturen die ohne vorherige Zustimmung erfolgt sind keine Haftung bernehmen Die Ger te sind ausschlie lich f...

Страница 11: ...n Bauteile unter Druck Spannung gesetzt werden Beim Anbringen der Schlauchverbindungen ist darauf zu achten dass sich keine empfindlichen Baugruppen in der N he der Schlauchbefestigungspunkte befinden...

Страница 12: ...zeitlich zu Ver nderungen hinsichtlich des Typs der Marke gekommen sein muss das mit dem Austausch beauftragte Fachpersonal eine Neuberechnung nach EN 13136 durchf hren und oder ProFroid um entspreche...

Страница 13: ...D ist ein Hautkontakt mit dem O Ring zu vermeiden Bei den DANFOSS Bauteilen ETS KVS SGN SGP Vermeiden Sie ein Hautkontakt mit dem Papier Vermeiden Sie etwaigen Staub einzuatmen der von dem Papier komm...

Страница 14: ...C R gime basse temp rature 40 C 20 C Fluides HFC R404A R507A R134A R407F R407A R407C R422A R417A R448A R449A Options Emballage renforc Bo tier de commande distance Protection anticorrosion des ailette...

Страница 15: ...sence de tension c t du sectionneur et de chaque circuit Tout c blage sur site doit tre conforme aux normes l gales en vigueur dans le pays concern Sauf ex cution sp ciale la tension nominale doit tr...

Страница 16: ...le flux de reprise de l vaporateur 3 OPERATIONS DE MISE EN ROUTE CONTROLES ET OPERATIONS PRELIMINAIRES G n ralit s V rifier le serrage des diff rents crous sur raccords colliers flexibles et c bles En...

Страница 17: ...tre sup rieure 2 6 mbar Le taux d humidit r siduel dans le circuit doit tre inf rieur 20 ppm Lorsque l on sera sous vide on ne proc dera jamais un contr le d isolement du moteur et on ne d marrera ja...

Страница 18: ...E L INSTALLATION D marrage du groupe de condensation Ouvrir toutes les vannes aspiration et refoulement du compresseur d part et retour liquide du r servoir Mettre un amp rem tre sur une phase du comp...

Страница 19: ...oteur du ventilateur au moins deux heures par semaine Tous les mois Effectuer un relev de fonctionnement Les pressions et les temp raturesdu compresseur Les intensit s du compresseur et des motoventil...

Страница 20: ...e distributeur Nettoyer ou d givrer l vaporateur 5 Pression d aspiration trop haute Remise en route apr s d givrage Attendre pour confirmation Probl me de compression Remplacer le compresseur 6 Pressi...

Страница 21: ...la cause et changer les fusibles Temporisation anti court cycle en court Attendre Relais thermique ou KRIWAN a coup Examiner la cause de la surcharge Interrupteur principal ouvert Fermer le sectionneu...

Страница 22: ...JlePOdu capteurdeprtssiOil pOli C m Jnda le s sseur 5 lA boucle de bbcn v ne MIIIre Pl enclmcht oo arrite le C Cr11pf tsse r Sl le Uindcs que la boucle Pl module la a du SeroU Dcg W eve 10 100 o Le ro...

Страница 23: ...progrorrrne Void b llne dft fmlctloru pecblu 0 fc rtdtOn de l afficheur lol tes lesleds s clatl en Appuyez PRO po r tntber lelest el sorlr lll rnidtalemen molllmanl SI VOUS appuyez SU SEL vous rd et...

Страница 24: ...arraer dernier ressarsdtSpOtllbles compr ptUentant le tm s nun d arr t l3 1 permutabon de marche desc me n a lv l2mmf d d marrerle resseur pmtr nt la dur e mn demardie 1la mn d arril estreccll l a e...

Страница 25: ...UT11s pour acdder l tous les aW es pllgOS l Irdlfllll los VI d Us esont U llllr EmersmiD Oldepas e 12 Ces va par flutpeuvert remocbfi esdansla page CcnfJ Unlhon En haut sur la barre trtichll ltle nom...

Страница 26: ...ons Room control by remote electronic controller Special coating in corrosive atmosphere by Blygold protection Waterproof remote control box on off switch light 5 m of cable Oil separator Oil separato...

Страница 27: ...t for special operation the nominal current must be power circuit 400V 3 N 50Hz Earth control circuit 230V 1 50Hz pressure switches fans speed control crankcase heaters Neutral is compulsory 230V volt...

Страница 28: ...he fans have completely stopped The safety HP and LP switches fans speed control and control LP switch can be accessed when the door is opened Then access to pressure plug for connecting the pressure...

Страница 29: ...mpressor Manufacturer s recommendations should be followed according to the type of refrigerant The use of colorants or UV tracers as leak detectors in the oil is not allowed Oil Refrigerant Mobil Arc...

Страница 30: ...t The condenser fan should cut or run at a low speed see chapter 8 Remainder of charge Fill up with the remainder very quickly An incomplete charge of fluid will cause considerable superheat and so ab...

Страница 31: ...and fan motors Safety cut off points of HP LP safety pressure switches Good functioning of remote electronic controller condensing control Oil levels Moisture in the circuits through sight glass or by...

Страница 32: ...tart after defrost Wait for confirmation Compression problems Change compressor 6 Condenser Pressure too high Insufficient flow of air in to the condenser Clean the condenser Check motor fans Fan cut...

Страница 33: ...t cycle time delay relay is in operation Wait Internal security switched out Check cause of increase in motor winding temperatures re set times 06 00 to 24 00 Main circuit breaker switch open Close ci...

Страница 34: ...ntmg cls are flush w1th deof OO iroller hoUSing Insert len key 111lo onl pll1f l hole nd tum cloclcwiSe MCIWUig clrnp Will tum and grJdua ly 2 unloedmg nive 12 ln tandem ccmpres cmdensmg oo U the s111...

Страница 35: ...II ofan abnn lhe alann cede sdosplayed l nl tely wdh these ec ttd d2l3 The W er ean mt t the Al um code Pl tlsthesabuttontosc roll Il p Sibledll layable bb The d splay wtlllfl lw fer m d lhe numencal...

Страница 36: ...delay 0 99 Osee 0 ms ron llllllt 0 99 1001Xlto 0 uO Resetopenllng bme 0 don hmg 1 resel 9 oraiiiiR l11ne fan 1 0 1 0 ut EnableldasJble fan1 0 1 fla_g_ 1 100 EMERSON EC2 552 Condensing Unit Controller...

Страница 37: ...mly and lh da e Il s not nec essary to ent r a usemame or passw d A u emame and password woll be ted upm the m1wl to any of the cth r WebPages The factcry defaults llngsare Usemame EmersonlD Pauword...

Страница 38: ...ngf r Aufstellorte mit besonderer Beeintr chtigung Luftverschmutzung korrosive Luft etc durch Blygold Schutz Wasserdichte Box f r Fernsteuerung Ein Aus Schalter Licht 5 m Kabel labscheider labscheider...

Страница 39: ...temperaturen k nnen unter extremen Umst nden Verlust der K ltemitteleinspritzungoder sehr hohes Verdichtungsverh ltnis eine Besch digung des Verdichters verursachen F r die Verdichter der Baureihen ZF...

Страница 40: ...ers 3 INBETRIEBNAHME EINGANGSPR FUNGEN UND ABL UFE Allgemeine Information Sicherstellen dass alle Verschraubungen an den Verbindungsflanschen flexiblen Schlauchverbindungen und Kabeln festgezogen sind...

Страница 41: ...gsvorgangs sollte nicht nach der Geschwindigkeit beurteilt werden mit der der Vakuumzustand erreicht ist sondern nach der tats chlichen Zeit mit der er gehalten werden kann 24 Stunden bei 0 7 bar sind...

Страница 42: ...teme Wichtig Die Drucksensoren befinden sich auf den Verdichterventilen und das ffnende Ventil sollte mit dem Kreislauf verbunden bleiben 1 4 T INBETRIEBNAHME Inbetriebnahme der Verfl ssigungseinheit...

Страница 43: ...wenn die T r ge ffnet ist Dann ist ein Ansteuern des Drucksteckers zum Verbindung des Druckmanometers m glich Die Druckmanometerkabel f hren durch L cher imGeh use Ein Befolgen dieser Anweisungen erm...

Страница 44: ...n die eventuell zu Korrosion f hren k nnen AUSTAUSCH VON L FTERMOTOREN Diese Arbeiten d rfen nur ausgef hrt werden wenn die Stromzufuhr ausgeschaltet wurde einen entsprechenden Warnhinweis am Hauptsch...

Страница 45: ...Kreislauf im Verteiler Reinigen oder abtauen des Verdampfers 5 Sauggasdruck zu hoch Neustart nach Abtauung Auf R ckmeldung warten Verdichterprobleme Austausch des Verdichters 6 Verfl ssigerdruck zu ho...

Страница 46: ...ung Siehe Abschnitte 13 und 10 15 Verdichtermotor l uft nicht an ND Schalter schaltet aus Siehe Abschnitt 3 HD Schalter schaltet aus Siehe Abschnitt 6 Sicherungen durchgebrannt berpr fung der Ursache...

Страница 47: ...lht lld con 11 RC Io tl r o dm l tual u Grur llobi Ct dochlrt hm IO o unJ IOO o modu e O oo al i l lllll GrurJl4Sioefdo hlt tc ord cr noe le l oo I Shliil e t f Jch f lul l ct cf1u _ s ltu l J l n o...

Страница 48: ...lnnn x de t bw cliSCb S m it dcm Mcnw 11 ange 7 iJ l O Anxl i des Abt mood ii lutl l lllllCixlrikkt fdCil Mit SEl k illlcn die M ll l t IC aUer Fr bl f naebin ndct t SC Zi 1 fdCI I D1t i5t hilff ich W...

Страница 49: ...0 tlUJ Ses h lllel 1 dnc ich hCl l llstOut Jeo Il der o rftill hfiiCU Vcrdkh cr cin bei km1 Uil _Allli il L I C l lllh istj l cisll tnp uh llCil Schshe1 J m k1 1 on Jer fllg u iul V l diehtcr h fi b...

Страница 50: ...jcim c tt l lli etl utv ill ulf inc der iill k r on Seill l wifd dii l lllUD tkl mut lS und dn Pal won ahgcft 1 J Ab WNks ind folst tlde Wn l in cs1o IIL Us t l ll iU I flnl 1 S4ml0 Pas W turd 11 Aurd...

Страница 51: ...48 e ct d ROl...

Страница 52: ...7 33 4 68 0 26 4 94 1 48 0 25 QUIETOR GQL ZF 30 T3TWIN R404A SEPR 30 231 1 67 6 77 6 13 0 44 6 57 1 03 7 47 5 35 0 44 5 79 1 29 0 25 QUIETOR GQL ZFD25 T3 EVI R404A SEPR 26 917 2 12 7 67 4 78 0 44 5 22...

Страница 53: ...GQL ZF 34 T2 R404A 8 26 4 01 0 26 4 27 1 93 9 10 3 46 0 26 3 72 2 45 0 25 QUIETOR GQL ZF 30 T3TWIN R404A 8 40 4 45 0 44 4 89 1 72 9 27 3 73 0 44 4 17 2 22 0 25 QUIETOR GQL ZFD25 T3 EVI R404A 8 27 3 4...

Страница 54: ...4 16 0 44 4 60 1 47 0 25 QUIETOR GQL ZFD26 T3 EVITW HNP SEPR 25 442 1 85 6 32 5 06 0 44 5 50 1 15 6 68 4 22 0 44 4 66 1 43 0 25 QUIETOR GQL ZF 30 T3TWIN H N P SEPR 28 908 1 71 6 64 6 34 0 44 6 78 0 98...

Страница 55: ...6 2 96 0 44 3 40 2 34 0 25 QUIETOR GQL ZFD26 T3 EVITW HNP 7 04 3 30 0 44 3 74 1 88 7 22 2 62 0 44 3 06 2 36 0 25 QUIETOR GQL ZF 30 T3TWIN H N P 8 00 4 08 0 44 4 52 1 77 8 68 3 37 0 44 3 81 2 28 0 25 Q...

Страница 56: ...3 31 2 60 0 25 QUIETOR GQH ZBD57 T2 R134A SEPR 14798 3 30 7 95 3 55 0 26 3 81 2 09 8 58 3 05 0 26 3 31 2 59 0 25 QUIETOR GQH ZB 58 T3TWIN R134A SEPR 15604 3 15 8 00 3 48 0 44 3 92 2 04 8 62 2 99 0 44...

Страница 57: ...T3TWIN R134A 9 67 2 41 0 44 2 85 3 39 10 46 1 98 0 44 2 42 4 32 0 25 QUIETOR GQH ZB 66 T2 R134A 10 96 2 73 0 26 2 99 3 67 11 92 2 18 0 26 2 44 4 89 0 25 QUIETOR GQH ZB 76 T2 R134A 12 17 3 31 0 26 3 57...

Страница 58: ...A SEPR 24815 3 20 12 91 6 01 0 26 6 27 2 06 14 37 5 33 0 26 5 59 2 57 0 25 QUIETOR GQH ZB 58 T3TWIN R404A SEPR 24976 3 24 13 16 6 64 0 44 7 08 1 86 14 71 5 62 0 44 6 06 2 43 0 25 QUIETOR GQH ZBD58 T3T...

Страница 59: ...R404A 16 33 4 49 0 26 4 75 3 44 18 24 3 81 0 26 4 07 4 48 0 25 QUIETOR GQH ZBD57 T2 R404A 16 33 4 49 0 26 4 75 3 44 18 24 3 81 0 26 4 07 4 48 0 25 QUIETOR GQH ZB 58 T3TWIN R404A 16 80 4 42 0 44 4 86...

Страница 60: ...24209 3 21 12 64 5 48 0 44 5 92 2 14 13 79 4 80 0 44 5 24 2 63 0 25 QUIETOR GQH ZBD57 T2 H N P SEPR 26244 3 00 12 79 5 06 0 44 5 50 2 33 13 83 4 60 0 44 5 04 2 74 0 25 QUIETOR GQH ZB 58 T4TWIN H N P...

Страница 61: ...6 75 3 42 0 44 3 86 4 34 0 25 QUIETOR GQH ZBD57 T2 H N P 15 21 4 19 0 44 4 63 3 29 16 51 4 00 0 44 4 44 3 72 0 25 QUIETOR GQH ZB 58 T4TWIN H N P 15 85 3 65 0 44 4 09 3 88 17 27 2 93 0 44 3 37 5 12 0 2...

Отзывы: