![ProfiTap C1P-1G Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/profitap/c1p-1g/c1p-1g_product-manual_1611200003.webp)
II
• 1 x Main TAP Unit (C1R-1G/C1P-1G/C1R-1G-48V/C1R-1G-BAT)
• 1 x 90-240 VAC to 12 VDC/0.5 A PSU (C1R-1G/C1P-1G/C1R-1G-BAT only)
• 2 x -48 VDC Terminal block connectors (C1R-1G-48V only)
• 1 x Carrying pouch (C1P-1G only)
This package includes:
If you have any questions, you can contact us through our website:
www.profitap.com
or by email:
For the latest documentation and software, visit our Resource Center:
https://www.profitap.com/resource-center/
Содержание C1P-1G
Страница 1: ...www profitap com C1R 1G C1P 1G C1R 1G 48V C1R 1G BAT 1 LINKGIGABITETHERNET COPPERTAPS PRODUCTMANUAL...
Страница 9: ...6 2 Move drawer to the right 3 Pull drawer out of the TAP 4 Pull connector out of the TAP...
Страница 10: ...7 5 Disconnect the battery 6 Install the new battery by following these steps in the reverse order...