13
STEP 1VH – Press
and
simultaneously for three seconds and release, then press
and
simultaneously and release. If screen in step 2VH does not appear in 5 seconds the lock on the
valve is activated.
STEP 2VH – Days, total since start-up: This display shows the total days since startup. Press
the NEXT button to go to Step 3VH. Press REGEN to return to previous step.
STEP 3VH – Regenerations, total number since start-up: This display shows the total number
of regenerations that have occurred since startup. Press the NEXT button to go to Step 4VH.
Press REGEN to return to previous step.
STEP 4 VH – Volume, total used since start-up: This display shows the total gallons treated
since startup. This display will equal zero if a water meter is not installed. Press NEXT button to
exit Valve History. Press REGEN to return to previous step.
STEP 5 VH – Error Log History: Up to 10 errors. If no errors have occurred " _ _ _ _ " is
displayed.
STEP 1VH
➔
VALVE HISTORY
RETURN TO NORMAL MODE
➔
STEP 2VH
970
DAY
STEP 3VH
235
➔
REGEN
STEP 4VH
175
➔
GAL
x1000
(Can not be reset)
CYCLE SEQUENCE
Cycle Sequence instructions allows the operator to set the order of the
cycle. The Softener System Setup allows the operator to set how long
the cycles will last. The operator may choose up to 9 cycles in any order.
END must be used as the last cycle option. The SOFTENING cycle
should only be used in brine prefill applications to allow salt to dissolve.
The following is an example of how to set a valve so that when regenera-
tion is initiated, BACKWASH occurs first, dn BRINE occurs second, RINSE occurs third, and FILL occurs fourth.
Cycle Options
BACKWASH
DN BRINE
FILL
RINSE
SOFTENING
END
STEP 5VH
1 - - -
➔
ERROR LOG
STEP 1CS
STEP 2CS
1.0T
STEP 1CS – Press NEXT and
simultaneously until TYPE appears on screen and release.
Then press NEXT and
simultaneously again for 3 seconds and release. If screen in step
2CS does not appear in 5 seconds the lock on the valve is activated.
STEP 2CS – Valve Type. Use the
or
to select from 1.0", 1.25", 1.50", 2.0L", 2.0" valve.
Pro315-TA Twin Alternating is a 1.0 ( )” valve. Press NEXT to go to Step 3CS.