4096-535
PRODELIN CORPORATION
3.8M C-BAND Rx/Tx ANTENNA SYSTEM
15
STEP 4:
STEP 5:
Lift the assembled support frame to
the Az/El positioner and secure with
1” hardware ( items 34, 35, 36 ). Lay
frame back to rest on positioner.
[ 34, 35, 36 ]
Both Sides
Positioner
Support Frame
A) Position quadrant 2 (quadrant 4 for
inverted) to the bottom left side of the
frame as shown.
Note
that it may be
necessary to loosen the 3 reflector
inserts to attain the proper alignment
with the 3 tubes in the support frame.
this procedure may occur with each of
the quadrants.
B) After the quadrant is in position,
place a spacer (item 27) between
each insert and tube (see Detail B).
repeat this procedure for all 4
quadrants.
C) Secure the quadrant to the frame with
1/2” hardware (Detail B ). Note that
there are 3 different 1/2” bolt lengths:
Location A = (items 23, 25, 26)
Location B = (items 22, 25, 26)
Location C = (items 24, 25, 26)
These locations are consistent with all
4 quadrants. Snug hardware only.
A
C
B
Quadrant 2
Support Frame