53
>>
assemBly oF tHe metallIC stRuCtuRe
w
After correctly positioning the first layer of rebar (fig 3), set out the metallic posts required
to assemble your pool (fig 8). Make sure that you fit them with jacks first (fig. 4). These posts
are joined together at the bottom with flat bars fastened by two screws (bag of screws A
and B fig. 4).
w
The distance between the each post is determined by the length of the flat bars.
w
The flat bars features 4 holes at each end.
w
The upper and lower connection bars are identical.
w
Around the base, the outer holes are used while the inner holes are used on bars
around the top of the structure. (fig 6).
w
Once the metallic structure has
been assembled, adjust the
position of the posts carefully
and check :
• that the posts are level, straight
and perfectly aligned.
• that the pool diagonals
measured at the axis of the
corner jacks are equal. (fig 8)
figure 6
take particular care
during this stage of
the assembly, it will
impact subsequent
phases and
determine the quality
of the pool finish.
caUtion
F
B
figure 7
level of the
finished slab
GRouNd - Bottom oF tHe exCavatIoN
slab
thickness
Height before
resurfacing