![Pro-safe 31238165 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/pro-safe/31238165/31238165_operation-and-maintenance-manual_1607176010.webp)
9
overheated. Once the machine overheated and it will stop and should
work again once it cools down.
INFLATION USING HIGH PRESSURE COMPRESSED AIR:
With on-scene coordinator oversight,
carefully attach hose to SCBA/dive air
cylinder and lock hose to air berm. Then turn
on cylinder air VERY slowly. Then inflate unit
until pressure relief valve operates - indicated
by sound of escaping air, which can be felt by
hand. IMMEDIATELY turn off compressed air
supply. The pressure relief valve will close
automatically when excess air has escaped
from unit.
NOTE! Never cover/block the pressure relief
valve, as the unit may burst!
Allow a steady, clean flow of air to inflate the unit. It will
take approx. 45 seconds to 5+ minutes to inflate the unit
(size of unit dependent) from an SCBA cylinder, and slightly longer if
using a compressor or the electric inflator/ deflator. Remove inflator /
deflator once unit is fully inflated.
NOTE! Support roof of shelter as it inflates! (helps unit stand)
4.
After
the
shelter stands up,
pull the four
corners and the
floor flat.