![Pro-Form 400 ZLE PFEVEL74910.0 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/pro-form/400-zle-pfevel74910-0/400-zle-pfevel74910-0_user-manual_1605856010.webp)
10
10. Using a small plastic bag to keep your hand
clean, apply some of the included grease to the
axle on the right side of the Upright (2).
Identify the Right Upper Body Arm (9), which is
marked with a “Right” sticker, and orient it as
shown. Slide the Right Upper Body Arm onto
the axle on the right side of the Upright (2).
Attach the Right Upper Body Arm (9) with an
M8 x 20mm Patch Screw (80) and an M8
Washer (33).
Repeat this step to attach the Left Upper
Body Arm (8).
10
8
9
2
33
80
Grease
11. Identify the Right Link Arm (98), which is
marked with a “Right” sticker, and orient it as
shown.
Apply grease to the axle on the Right Link Arm
(98).
Slide a Link Arm Cover (103) onto the axle on
the Right Link Arm (98).
Make sure that the
flat side of the Link Arm Cover is facing the
Right Link Arm.
Insert the Right Link Arm (98) through the Right
Pedal Arm (49). Attach the Right Link Arm with
an M8 x 20mm Patch Screw (80) and an M8
Washer (33).
Repeat this step to attach the Left Link Arm
(99).
11
98
49
80 33
99
Grease
Flat Side
103