background image

8

INFORMATION ON WASTE DISPOSAL FOR CONSUMERS OF 

ELECTRICAL & ELECTRONIC EQUIPMENT.

When this product has reached the end of its life it must be treated as Waste Electrical 

& Electronic Equipment (WEEE). Any WEEE marked products must not be mixed with 

general household waste, but kept separate for the treatment, recovery and recycling 

of the materials used. Waste batteries can be returned to any waste battery recycling 

point which are provided by most battery retailers. Contact your local authority for 

details of battery and recycling schemes in your area.

Made in China. PR2 9PP

Man Rev 1.0

SPECIFICATIONS

Input voltage:

220-240V~, 50Hz

Rated power:

4.5W

Lamps:

SMD 3528 LEDs x 26 pcs

Luminous flux:

40Lm (AC/DC)

Continuous emergency  illumination:

> 3 hours  

(when the battery is fully charged) 

Battery pack:

Ni-Mh 3.6V 1.8Ah

Recharge time:

24 hours – approx.

Ambient temperature:

0 - 35°C

Over-discharge protection:

Yes

Ingress protection rating:

IP20

Changing the fuse.

1.  Isolate from the mains supply.

2.  Remove the product from the wall, release the wiring from the retention slot and 

prize off the rear cover.

3.  Remove the fuse from it’s housing and replace with one of the same type  

(240V F3A).

4.  Refit the rear panel feeding the wire into the retention slot.

5.  Re-attach the product to the wall and test it’s operation.

Changing the battery

• 

If after a routine operation check, the lamp does not remain lit for the 3 hour period, 

a new battery pack may be required. Change the battery pack as follows:

1.  Isolate from the mains supply.

2.  Remove the legend diffuser.

3.  Unplug the 2 pin white battery pack connector.

4.  Remove the old battery pack. 

5.  Write the current date on the new battery pack.

6.  Fit the new battery pack and secure in position.

7.  Reconnect the battery pack terminal connector.

8.  Refit the diffuser making sure that it is securely clipped in place.

9.  Restore mains power and allow to charge for 24 hours.

10.  Perform the full operation check and update the test record.

Отзывы: