F
F
r
r
e
e
e
e
w
w
a
a
y
y
R
R
a
a
n
n
g
g
e
e
S
S
y
y
s
s
t
t
e
e
m
m
U
U
s
s
e
e
r
r
G
G
u
u
i
i
d
d
e
e
P
P
r
r
o
o
-
-
B
B
e
e
l
l
L
L
t
t
d
d
2
2
6
6
H
H
U
U
-
-
F
F
r
r
e
e
e
e
w
w
a
a
y
y
R
R
a
a
n
n
g
g
e
e
S
S
y
y
s
s
t
t
e
e
m
m
U
U
s
s
e
e
r
r
G
G
u
u
i
i
d
d
e
e
n
n
2
2
.
.
1
1
3
3
S
S
e
e
t
t
t
t
i
i
n
n
g
g
t
t
h
h
e
e
r
r
e
e
s
s
e
e
t
t
s
s
w
w
i
i
t
t
c
c
h
h
There are physically two RESET switches available to perform a hard reset of the
Freeway controller. One is located on the edge of the 2440 sub-module and the other
is remotely located on the front edge of the Main Card on which the 2440 is sited.
Pressing either has the same effect.
Initiating a hard reset is akin to powering down and powering up the controller. The
controller re-boots and follows the usual power-up sequence. It should be noted that
the panels will shut down and then be restored after initialisation has completed. It
should also be noted that resetting the active controller in a dual control
environment will cause system changeover.
If no changes have been made to the database then no crosspoints will be changed.
However, crosspoint settings may change if the level type for a level was changed
prior to the reset as during initialisation the crosspoints are set according to the level
type for that level.