Fix in a solid wall with anchor plugs 8 x 120. 

 

Place packer material behind the screw fixing 
points. 

 

Place packer material behind the vertical 
frame. 

 

Fill the void between the mounting frame and 
the wall opening with gypsum. 

 

 

 

 

 

 

 

 

 

 

 

 

We recommend using our packer blocks made of non-combustible PRIODEK H to install the product. 
Packer is available in our product range. 

 

 

 

 

 

 

 

The frame and the door element should 
always be installed 

plumb

 and 

horizontal

A cross-line laser must be used for this. 

 

 

 

 

 

 

Packer material 

Содержание PRIODOOR ETX-RDA

Страница 1: ...Assembly and Operating Instructions PRIODOOR ETX RDA Air release shutter for pressure differential type smoke control systems opening on the shaft side Dated 05 2021 EP A 10154 4...

Страница 2: ...l to comply with the instructions We expressly reserve the right to make technical changes even without separate announcement which serve to improve our product or which are caused by changes in legis...

Страница 3: ...6 Assembling the mounting frame 7 Installing the mounting frame 7 Installing the door element 9 Installation detail ETX RDA in solid wall 10 Installation detail ETX RDA in PRIOWALL 11 Connector 11 Eme...

Страница 4: ...umb and horizontal A cross line laser must be used for the installation When putting down individual parts do not place them on their corners and layout the storage area with soft material beforehand...

Страница 5: ...the recognised rules of safe practice They may only be used for their intended purpose in indoor areas and only used if they in a faultless safe condition Any other use is deemed not to be as intende...

Страница 6: ...ction may only be made following consultation with PRIORIT as otherwise the approval warranty expires The warranty for installation work must be provided by the installer Warranty and liability claims...

Страница 7: ...ls against falling Place the mounting frame in the wall opening Align vertically plumb and horizontally Arrange the all round opening gap uniformly Place packer material under the screw fixing points...

Страница 8: ...e Fill the void between the mounting frame and the wall opening with gypsum We recommend using our packer blocks made of non combustible PRIODEK H to install the product Packer is available in our pro...

Страница 9: ...ews 4 5 x 80mm are then tightened and then the frame is aligned using the cross line laser Use the countersunk head screws 4 5 x 80mm to screw the remaining frame of the door element onto the mounting...

Страница 10: ...ction cable exit position Make sure that the connection cable is not damaged when drilling Guide the connection cable through the drillhole in the shaft Installation detail ETX RDA in solid wall Mount...

Страница 11: ...bracket which holds the chain drive is screwed IMPORTANT Do not use a cordless screwdriver use a manual screwdriver instead Move the door manually in the direction of the shaft Repair or replace the...

Страница 12: ...12 Technical information on the chain drive excerpts...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16 Chain motor technical data...

Страница 17: ...17...

Страница 18: ...d seals make good if necessary and prepare the corresponding report 5 Confirm that the ETX RDA is opened and closed by the control system and observe the ETX RDA make good if necessary and prepare the...

Страница 19: ...completeness replace seals if necessary Comments Final remark Condition of the installation New Good Poor System ready for operation Yes No Inspected by Date Name Signature With my signature I confir...

Страница 20: ...RDA with an external electricity source Check the wiring on site The ETX RDA does not open or close correctly or does not function after checking the above points Error in the control of the chain dri...

Страница 21: ...21 Notes...