CTD & CTDE
Vertical Contact Toasters
5
301-500rev
E
-EN
Operation
1
Turn unit on.
Turn
the power switch to ‘ON’
position. The switch is located on
the bottom right of the unit. The
switch will light up green if the unit
is successfully powered on.
The Prince Castle logo will be displayed, followed by a
screen that contains the
model’s current software and
hardware numbers.
2
Wait through warm-up.
On the Warm-Up screen, you can
view the current recipe in the top
right, followed by the set point
temperature and the current
platen temperature as the unit
warms. The thermometer icon will
be flashing to indicate that the unit
is still reaching its desired
temperature.
You can pause warm-up by
pressing the thermometer icon if
you want to change the set point.
The Run/Home screen will
appear. To change the set point:
A.
Press the thermometer icon
on the bottom of the
Run/Home screen. The Edit
Run Parameters screen will
appear.
B.
Press the Plus (+) symbol to
increase the set point or the
Minus (-) symbol to
decrease the set point.
C.
Press the check mark to accept the setting. The
Warm-Up screen reappears, and warm-up
continues.
NOTE: If you don’t want to accept the change, you can
wait for the screen to time out or you can press the back
arrow.
3
WARNING
BURN/ELECTRICAL SHOCK HAZARD! Platen area
is HOT and can cause severe burns or severe
shock. Keep hands and objects out of the toaster
unit! Failure to exercise caution may result in
serious injury! Follow the Cool Down procedure
before touching or working on internal apparatus.
When the current platen
temperature reaches the set point
temperature, the Run/Home
screen appears.
4
Make any desired adjustments.
Use the instructions in
Setting Adjustments
to make
changes to:
•
Crush Adjustment
•
Recipes
•
Temperature
•
Toast Time / Speed
•
Auxiliary heat % (For AX units only)
5
Begin continuous
feeding.
Feed product into top of
toaster, sending the
crowns down the back
lane and the heels down
the front lane. The bun
should be placed with cut
sides toward the middle of
the unit. Images on the
infeed will show correct
orientation.
Toasted product will exit
at the base of the toaster.
Printed in USA
5/1/2022
Содержание CTD
Страница 2: ...CTD CTDE Vertical Contact Toasters Printed in USA 5 1 2022 2 301 500revE EN ...
Страница 13: ...CTD CTDE Vertical Contact Toasters 13 Installing the Silicone Belt Printed in USA 5 1 2022 301 500revE EN ...
Страница 14: ...CTD CTDE Vertical Contact Toasters 14 Removing the Silicone Belt Printed in USA 5 1 2022 301 500revE EN ...
Страница 19: ...CTD CTDE Vertical Contact Toasters 19 301 500revE EN Exploded Views Printed in USA 5 1 2022 ...
Страница 20: ...CTD CTDE Vertical Contact Toasters 20 301 500revE EN Exploded Views continued Printed in USA 5 1 2022 ...
Страница 21: ...CTD CTDE Vertical Contact Toasters 21 301 500revE EN Exploded Views continued Printed in USA 5 1 2022 ...
Страница 22: ...22 301 500revE EN Exploded Views continued Printed in USA 5 1 2022 CTD CTDE Vertical Contact Toasters ...
Страница 23: ...23 301 500revE EN Wiring Diagram Printed in USA 5 1 2022 CTD CTDE Vertical Contact Toasters ...