Prince Castle 630-ROM4 Скачать руководство пользователя страница 2

Romar Pasta Cooker 

630-ROM4

 

 

Safety Information 

Important! 

 

 WARNING! 

Indicates information important to the proper operation of 
the unit. Failure to observe may result in damage to the 
equipment and/or severe bodily injury or death. 

 CAUTION! 

Indicates information important to the operation of the 
unit. Failure to observe may result in damage to the 
equipment. 

Prince Castle reserves the right to change specifications 
and product design without notice. Such revisions do 
not entitle the buyer to corresponding changes, 
improvements, additions or replacements for previously 
purchased equipment. 

 

Installation 

 

Pre-Installation 

General Setup 

Pre-installation is the responsibility of the user and should be 
completed prior to the shipment of the unit to the location. 

• 

• 

• 

• 

• 

• 

• 

Floor drain sink located no further than 10 ft. from the 

intended location of the unit. 

Electrical hookup box located no further than 5 ft. from the 

intended location of the unit. The box should provide three 
phase, 240 V protected with a three-phase 30-A breaker. All 
terminals should be rated for gauge number 10-4 wire (L1-L2-
L3-Ground). 

Dedicated water outlet with manual shut off valve no further 

than 7 ft. from the intended location of the unit. The water 
pressure should be at least 50 psi.  The manual shut-off valve 
output has to accommodate ¾ in. NPT Hose connector. 

Supporting counter with the minimum suggested dimensions 

of 24 in. high, 28 in. deep, and 44 in. wide. The counter must be 
capable of withstanding 340 lbs (weight of unit). 

This unit is completely pre-wired and thoroughly tested prior to 
shipment. All wiring and hookups shall be done without 
opening the unit. 

Place unit on the counter. The counter must be designed to fit 

the size and support the weight of the unit. 

The unit must be level to insure proper function. To level the 

unit, use only the adjustable leveling feet (no shims or foreign 
objects). 

EPH require a minimum height of 4 in. between the counter 

and the unit. 

 

Plumbing Connections 

It is highly recommended that a licensed plumber install all 
plumbing connections. 
All pre-installation and installation work must be in compliance 
with national and local plumbing codes and health department 
requirements. 

• 

• 

• 

• 

For standard water installation, connect per local plumbing 

codes. 

The drainage from the unit to the floor sink is achieved by 

gravity only. Make sure that the 1” white PVC tubing is directed 
downwards preventing any back-flow to the unit. Most local 
Health Departments require you to terminate the drainage tube 
4 in. above the highest point of the floor-sink. 

When connecting the steam generator blow-down outlet, 

ensure that the valve (provided by Prince Castle) is reachable 
(arms length) from the front of the unit. The connecting “black 
pipe” must be installed behind the unit and below the counter, 
away from easy reach. The blow-down piping must be 
secured all the way to the floor sink. 

Do NOT reduce the blow-down outlet from its original size. 

 

Depending on local regulations, you may be required to 
install a second check valve or pressure reducing back-
flow preventive device. 

 

 

 

Printed in USA  0404 © 2004 

630-500 

Содержание 630-ROM4

Страница 1: ...and or mileage Travel mileage is limited to 100 miles 200 kilometers round trip one trip warranty from an authorized service agency or its sub service agency This warranty is subject to the following exceptions conditions Use of any non genuine Prince Castle parts voids this warranty All labor shall be performed during regular work hours Overtime premium will be charged to the buyer Damage caused ...

Страница 2: ...pable of withstanding 340 lbs weight of unit This unit is completely pre wired and thoroughly tested prior to shipment All wiring and hookups shall be done without opening the unit Place unit on the counter The counter must be designed to fit the size and support the weight of the unit The unit must be level to insure proper function To level the unit use only the adjustable leveling feet no shims...

Страница 3: ...s indicated in the Pre Installation requirements the user must provide a circuit breaker between the main power source and the unit Refer to nameplate for rating The unit is wired and tested by the factory to operate only with a single phase power configuration with one ground for main load and circuit control To avoid severe electrical shock provide grounding in accordance with N E C requirements...

Страница 4: ...g cut pasta Use only pasta recommended by Prince Castle Using other types of pasta or food may cause severe damage and void all warranties and maintenance contracts 3 4 A Remove the loading box cover allowing pasta to fall into the hopper B Place loading box cover firmly on top of loading box The long cut Pasta Dispenser is now ready for use It is recommended that you keep the hopper supplied with...

Страница 5: ...thoroughly before first time use Wash trays and all strainers frequently to prevent starch accumulation Switching the Unit On 1 2 Ensure that all the previous steps were executed properly before proceeding A Visually and manually check that the Blow Down valve is closed B Check that water supply line is fully opened Verify that the on off switch on the back of the unit is in ON position When unit ...

Страница 6: ...as filled the Sight Glass halfway WARNING EXPLOSION DAMAGE INJURY HAZZARD The Sight Glass indicator should NEVER rise above the full position If so immediately shut down the unit and call for repair WARNING EXPLOSION DAMAGE INJURY HAZZARD Do NOT turn either of the two red handled Sigh Glass turn valves These are used by authorized service personnel ONLY Hold the blue I O button for approx 3 secs T...

Страница 7: ...omplete Daily Blow Down Procedure IMPORTANT It is extremely important to fully understand and perform these maintenance procedures This procedure should be performed with caution preferably at the end of the workday For the first few days only TWO blow downs per day are recommended to clean the inside of the boiler A daily blow down is essential maintenance for a steam generator It lengthens the l...

Страница 8: ...for about 3 secs to turn the unit on C Fill the boiler with water Procedure Complete Daily or Weekly Clean Up 1 IMPORTANT This process is semi automatic and must be followed exactly Frequency of this procedure depends upon frequency of usage Failure to comply with this procedure may void the unit warranty Remove the four funnels from the top of the unit IMPORTANT Use a standard long handle 3 5 scr...

Страница 9: ... start the automated cleaning cycle The top gates automatically close The chambers are flushed and rinsed and the bottoms gates are closed When the cleaning cycle is finished approx 30 secs the unit automatically shuts down 6 7 A When finished ensure that all foreign objects are removed from the chambers B Replace the funnels Slide the three dispensers forward to their normal position Ensure that ...

Отзывы: