46
Chapter 4 Installing Options
■
How to remove FC Pass-Thru Blades
1
Touch a metal part of the chassis to discharge static electricity.
2
Disconnect the Fibre Channel cable connected to the FC Pass-Thru Blade.
3
Lower the SFP module lever, unlock the lock and remove.
4
Remove the FC Pass-Thru Blade.
Grip and pull on the handle (1), pull the FC
Pass-Thru Blade towards you and remove it
(2).
5
Install the network blade/dummy Switch Blade.
How to install Switch Blades/GbE Pass-Thru Blades" (pg.44)
How to install a FC Pass-Thru blade" (pg.47)
The procedure for removing the dummy Switch Blade is the same as that for removing the Switch
Blade. Be sure to keep the removed dummy Switch Blades for later use (
Switch Blades/GbE Pass-Thru Blades" (pg.42)).
After removing the FC Pass-Thru Blades/dummy Switch Blade, do not operate the chassis with an
empty slot. Be sure to install a network blade or a dummy Switch Blade.
SFP module
Lever
1
2
Handle
Содержание BX600 S2
Страница 16: ...16 Chapter 1 Component Names and Functions ...
Страница 20: ...20 Chapter 2 Security ...
Страница 84: ...84 Chapter 6 Technical Information ...