Installation

Handling Prior to Installation

•  Avoid introducing contaminants into the unit.
•  When handling the unit, we recommend wearing 

clean, white cotton gloves to avoid smudging.

•  Store the units in a covered, dry location while 

waiting for installation. Location should be 
cleaned of excess dust before installation.

Pre-Installation Review

Read manual in its entirety before installation. Determine 
where the beams should be located. The beam construction 
determines the beam performance. Ensure the following match 
the beam schedule:
•  Length
•  Nozzle size
•  Number of pipe connections
•  Coil handing
•  Coil circuiting
•  Inlet size and location

Unit Installation

STEP 1 – INSTALL BLOCKING

ACBC active beams come standard with mounting brackets 
that utilize blocking to secure the beam to the wall. The 
location of the mounting brackets is shown on page 3.

Secure blocking that runs across the wall at the height of the 
beam mounting brackets. The blocking should be securely 
fastened to the stud wall or similar structure. Blocking and 
fasteners are by others. Please see Figure 2.

It is recommended to perform a dry fit installation at this stage 
to ensure blocking and mounting bracket alignment. Remove 
the face of the beam using a 4mm hex key for the ¼ turn 
latches and set aside on a clean, flat surface to avoid damage. 
Place beam in desired location against the wall and blocking 
and verify proper alignment. The ACBC can then be removed 
for installation of the water headers in between the blocking.

NOTE:

 Multiple ACBC can be installed continuously along 

a wall. All units should be dry fit together to ensure proper 
alignment and location of inlet and water. If piping and air 
connections require additional space between wall and chilled 
beam, consider using flashing pieces to cover gap. Flashing 
pieces by others.

FIGURE 1: MOUNTING BRACKETS 

FIGURE 2: UNIT ALIGNMENT 

ACBC 1-WAY

WALL MOUNTING 

BRACKETS

ACBC 2-WAY

WALL MOUNTING 

BRACKETS

FLOOR MOUNTED ACTIVE BEAM

INSTALLATION & MOUNTING INSTRUCTIONS

5

www.priceindustries.com   |   FLOOR MOUNTED ACTIVE BEAM - Manual

Содержание ACBC Series

Страница 1: ...MANUAL INSTALLATION Floor Mounted Active Beam ACBC Series v300 Issue Date 07 16 20 2020 Price Industries Limited All rights reserved...

Страница 2: ...nsional Data 3 Installation 5 Water System Preparation 7 Air System Preparation 7 Damper Installation 8 Interpretation of Beam Tag 9 Airflow Calibration Chart for 3ft ACBC 10 Airflow Calibration Chart...

Страница 3: ...he floor Determine where beams should be located using building drawings and identification tags on schedule and units Ensure the beam s length nozzle size number of pipe connections pipe circuiting d...

Страница 4: ...SIDE INLET TR TOP RIGHT CASING OPENING WITH RIGHT SIDE INLET TLR TOP LEFT CASING OPENING WITH LEFT RIGHT SIDE DUAL INLET TRL TOP RIGHT CASING OPEN WITH LEFT RIGHT SIDE DUAL INLET ACBC FLOOR MOUNTED AC...

Страница 5: ...NGTH ACTIVE COIL LENGTH INLET OPTION CONFIGURATIONS 3 1 2 TYP WALL MOUNT OVERALL LENGTH L ACTIVE COIL LENGTH CL INLET LOCATION 36 000 L R LR TL TR TLR TRL 60 000 L R LR 36 000 L R LR TL TR TLR TRL 60...

Страница 6: ...olid Edge 5 6 ACBC ACTIVE CHILLED BEAM CABINET 2019 04 29 PROJECT ENGINEER CUSTOMER SUBMITTAL DATE SPEC SYMBOL Copyright PRICE INDUSTRIES 2018 270567 KHH ACBC 1 1 ACTIVE COIL LENGTH SECTION SL SHIFT L...

Страница 7: ...ckets The blocking should be securely fastened to the stud wall or similar structure Blocking and fasteners are by others Please see Figure 2 It is recommended to perform a dry fit installation at thi...

Страница 8: ...e beam water coil Hard pipe connections or flexible hose can be used As water lines are being connected ensure geometry allows for installation of any accessories on following pages STEP 5 CONNECT THE...

Страница 9: ...ugh bends in the duct are permitted close to the air inlet there should be 3 duct diameters straight leading into inlet to ensure laminar flow only straight ductwork connections will yield a reliable...

Страница 10: ...cations that are accessible for inspection and removal if necessary In order to avoid additional noise in the occupied space 1 The MQ VAV damper should be installed at least 5 duct diameters upstream...

Страница 11: ...ulation 18 Protection Film 19 Finish 1 Model 2 Active Inactive Bookshelf 3 Length in 4 Inlet Locations 5 FInish 1 Model 2 Length in 3 Inlet Locations 4 FInish 1 Model 2 Length in 3 FInish ACBC 1 1 I 1...

Страница 12: ...0 90 80 70 60 50 40 30 20 10 0 1 00 0 90 0 80 0 70 0 60 0 50 0 40 0 30 0 20 0 10 2 W A Y S I Z E 7 0 1 W A Y S I Z E 5 0 1 W A Y NOTE Data presented for Standard Atmosphere at sea level FLOOR MOUNTED...

Страница 13: ...10 0 1 00 0 90 0 80 0 70 0 60 0 50 0 40 0 30 0 20 0 10 60 70 80 90 100 110 120 130 140 150 2 W A Y S I Z E 7 0 1 W A Y S I Z E 5 0 1 W A Y NOTE Data presented for Standard Atmosphere at sea level FLOO...

Страница 14: ...0 0 90 0 80 0 70 0 60 0 50 0 40 0 30 0 20 0 10 60 70 80 90 100 120 140 160 180 110 130 150 170 190 2 W A Y S I Z E 7 0 1 W A Y S I Z E 5 0 1 W A Y NOTE Data presented for Standard Atmosphere at sea le...

Страница 15: ...40 20 0 1 00 0 90 0 80 0 70 0 60 0 50 0 40 0 30 0 20 0 10 120 140 160 180 200 220 240 2 W A Y S I Z E 7 0 1 W A Y S I Z E 5 0 1 W A Y NOTE Data presented for Standard Atmosphere at sea level FLOOR MO...

Страница 16: ...0 90 0 80 0 70 0 60 0 50 0 40 0 30 0 20 0 10 90 105 120 135 150 165 180 195 210 225 240 255 270 285 2 W A Y S I Z E 7 0 1 W A Y S I Z E 5 0 1 W A Y NOTE Data presented for Standard Atmosphere at sea l...

Страница 17: ...Bookshelf B 1 Back Panel C 1 Access Door D 6 Screws E 1 4mm Allen Key A 1 BOOKSHELF B 1 BACK PANEL C 1 ACCESS DOOR E 1 4MM ALLEN KEY D 6 SCREWS BOOKSHELF PARTS DETAIL E FLOOR MOUNTED ACTIVE BEAM INSTA...

Страница 18: ...ght PRICE INDUSTRIES 2018 ACTIVE CHILLED BEAM CABINET BOOKSHELF 270571 KHH ACBCBK 1 1 WALL MOUNTING BRACKETS ACTIVE BOOKSHELF SHOWN 30 000 CASING LENGTH 13 500 INACTIVE BOOKSHELF SHOWN 30 000 WALL MOU...

Страница 19: ...lar structure Blocking and fasteners provided by others Step 3 Place the bookshelf flush against the wall and connecting unit s pictured in Figure 3 Step 4 Open access door by using 4mm allen key and...

Страница 20: ...s Step 7 Place hands in both slots in the back panel and lean the top part of the panel towards you and remove the back panel as pictured in Figure 6 Do not discard back panel place it on a clean and...

Страница 21: ...tate the top towards the wall until the panel is in its desired location Reference Figure 8 Step 10 Align the holes of the back panel with the holes on the bookshelf and secure in place with the two s...

Страница 22: ...PROJECT ENGINEER CUSTOMER SUBMITTAL DATE SPEC SYMBOL Copyright PRICE INDUSTRIES 2018 Submittal Sheet ACTIVE CHILLED BEAM CABINET BOOKSHELF 270571 KHH ACBCBK 1 1 WALL MOUNTING BRACKETS ACTIVE BOOKSHEL...

Страница 23: ...ovided by others Step 3 Place the bookshelf flush against the wall and connecting unit s pictured in Figure 10 Step 4 Remove both sets of side screws from the middle shelf that secure it to the side p...

Страница 24: ...he wood blocking with screws by others pictured in Figure 13 Step 8 Repeat step 7 for bottom mounting brackets pictured in Figure 13 Step 9 Place back panel flanges into slots while the top of the bac...

Страница 25: ...11 Install the middle shelf Align the holes of the middle shelf with the holes of the side panel and secure in place with four screws from step 4 Reference Figure 16 FIGURE 15 FIGURE 16 D INSTALL SCRE...

Страница 26: ...1 Bottom Mounting Bracket E L 6 Self Tapping Screws F 8 Pop Rivets A 1 FILLER SECTION C 1 TOP MOUNTING BRACKET E L 6 SELF TAPPING SCREWS B 4 SIDE MOUNTING BRACKET D 1 BOTTOM MOUNTING BRACKET FILLER SE...

Страница 27: ...KETS 30 000 MIN 6 000 MAX 36 000 USER ENTRY 1 8 INCREMENT STANDARD CONSTRUCTION 16 GAUGE CONSTRUCTION STEEL NOTES FACTORY TOLERANCE 1 32 FINISH B12 WHITE POWDER PAINT SPL SPECIAL COLOR PAINT FLOOR MOU...

Страница 28: ...Step 4 Locate the bottom mounting bracket 8 in from the wall and secure using a screw s by others into the floor Pictured in Figure 18 Bottom mounting bracket should align with adjacent ACBC kick pla...

Страница 29: ...brackets and at the same time insert the top flange of the filler section into the top mounting bracket as pictured in Figure 21 Push down to secure in place Step 8 Use the self tapping screws in pilo...

Страница 30: ...beam A 1 Utility Cabinet B 1 Access Door C 1 4mm Allen Key A 1 UTILITY CABINET B 1 ACCESS DOOR C 1 4MM ALLEN KEY UTLITY CABINET PARTS FLOOR MOUNTED ACTIVE BEAM INSTALLATION MOUNTING INSTRUCTIONS 28 F...

Страница 31: ...LR LEFT RIGHT TL TOP LEFT TR TOP RIGHT TLR TOP LEFT RIGHT FINISH B12 WHITE POWDER PAINT SPL SPECIAL COLOR PAINT 24 000 30 000 13 500 ACCESS DOOR 1 4 TURN LATCH FOR ACCESS 3 545 OF REV 0 SHEET Solid E...

Страница 32: ...steners by others Step 3 Place the utility cabinet flush against the wall and or connecting unit s pictured in Figure 22 Step 4 Using the 4mm allen key open the access door and turn both spring latche...

Страница 33: ...door and retighten the spring latches by turning them both to the right until secure Pictured in Figure 25 FIGURE 24 FIGURE 25 MOUNTING BRACKETS B DETAIL B Figure 3 Part A SCREW IN Figure 3 Part B SC...

Страница 34: ...FLOOR MOUNTED ACTIVE BEAM NOTES 32 FLOOR MOUNTED ACTIVE BEAM Manual www priceindustries com...

Страница 35: ...FLOOR MOUNTED ACTIVE BEAM NOTES 33 www priceindustries com FLOOR MOUNTED ACTIVE BEAM Manual...

Страница 36: ...Price Industries Limited All rights reserved This document contains the most current product information as of this printing For the most up to date product information please go to www priceindustrie...

Отзывы: