Operating
controls
and
operation
04/2015
S.
41
6.2
Initial
start
‐
up
The
trial
run
is
conducted
by
the
manufac
‐
turer's
specialist
staff.
At
the
same
time
the
instruction
of
the
operating
personnel
takes
place
In
an
emergency
the
machine
can
be
stopped
and
shut
down
immediately
by
pressing
the
Emergency
Stop
push
‐
button
key.
6.3
Daily
inspection
tasks
Carry
out
the
following
work
every
day
before
starting
up
the
plant:
•
Visual
check
for
obvious
damage
to
mechanical
and
electrical
parts.
It
is
prohibited
to
start
the
machine
if
a
protection
device
malfunctions.
•
Check
protection
devices
for
proper
functioning
(see
chapter
Maintenance)
•
If
it
is
heavily
soiled
the
plant
must
be
cleaned
before
start
‐
up.
Set
the
master
switch
to
the
"
0
"
position
before
cleaning
and
guard
it
with
a
padlock
against
unauthorised
access.
On
completion
of
the
cleaning
close
and
lock
all
protective
flaps
and/or
doors
or
inspection
flaps.
•
All
other
work
must
be
carried
out
in
accordance
with
the
maintenance
schedule
.
For
instructions
on
transport,
loading
and
storage
please
observe
the
instructions
in
the
chapter
"Safety".
Functions
and
operation
of
the
various
different
types
of
channel
baling
press
are
similar.
The
differences
mainly
relate
to
press
performance,
dimensions
and
weight.