111/112
Personal notes
PRESTIGE (Establishment of the company SPBI)
BP 529 - 85505 LES HERBIERS cedex - FRANCE
Tel. (33) 02 51 64 20 20 - Fax (33) 02 51 67 37 65
Internet : http://www.jeanneau.com(fr).
.T
h
e
p
re
s
e
n
t
d
o
c
u
m
e
n
t
is
n
o
t
c
o
n
tr
a
c
tu
a
l
a
n
d
s
in
c
e
w
e
c
o
n
s
ta
n
tl
y
d
e
s
ir
e
t
o
i
m
p
ro
v
e
o
u
r
m
o
d
e
ls
,
w
e
r
e
s
e
rv
e
t
h
e
r
ig
h
t
to
m
o
d
if
y
t
h
e
m
w
it
h
o
u
t
n
o
ti
c
e
Содержание 350
Страница 1: ...PRESTIGE 350 OWNER S MANUAL S PORTS ET LOISIRS 123682 Index E ...
Страница 2: ......
Страница 4: ......
Страница 7: ...3 112 HISTORY OF UPDATES Index A 02 2011 Index B 10 2011 Index C 11 2012 Index D 03 2013 ...
Страница 8: ......
Страница 10: ......
Страница 11: ...7 112 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS DESIGN CATEGORY YOUR BOAT 1 ...
Страница 16: ......
Страница 21: ...17 112 POSITION OF GAS BOTTLE 2 SAFETY ...
Страница 35: ...31 112 HULL MAINTENANCE OF THE HULL LIFTING 3 ...
Страница 38: ......
Страница 48: ...44 112 Fixing PERFIX Press Pull WARNING Refer to the manufacturer s instructions for use and maintenance ...
Страница 49: ...45 112 STEERING SYSTEM STEERING GEAR 5 ...
Страница 51: ...47 112 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS INTERIOR EQUIPMENT 6 ...
Страница 52: ...48 112 INTRODUCTION Saloon Cabins ...
Страница 55: ...51 112 INTERIOR EQUIPMENT Sink Sliding hatch Must be secured while sailing 6 INTERIOR ...
Страница 56: ...52 112 Mosquito net Blackout curtain Shower screen Fixing Access Technical room Under the starboard bench seat ...
Страница 57: ...53 112 WATER AND SEWAGE WATER WATER TANKS WATER SYSTEM DISTRIBUTION WASTE WATER DRAINAGE SYSTEM SEWAGE WC 7 ...
Страница 70: ......
Страница 78: ...74 112 CD PLAYER AND RADIO Location Port saloon BOW THRUSTER General view Control Steering station Anode ...
Страница 80: ...76 112 HYDRAULIC GANGWAY Location Maximum load 170kg Length Folded out 2 3m Control ...
Страница 93: ...89 112 ENGINE GENERAL INFORMATION ENGINE INSTALLATION 9 ...
Страница 105: ...101 112 LAUNCHING LAUNCHING RECOMMENDATIONS 10 ...
Страница 106: ...102 112 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm ...
Страница 108: ...104 112 Note Measurements are expressed in mm Vue avant 2950 389 389 3728 2600 2950 ...
Страница 111: ...107 112 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11 ...
Страница 114: ......
Страница 116: ......