![Prem-I-Air EH0530 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/prem-i-air/eh0530/eh0530_instruction-manual_1595355010.webp)
Page 10
2. Template
Fasten the template to the wall once the following guidelines have been
thoroughly checked.
z
Do not drill any holes until you are 100% confident that there are no
obstacles in the area you wish to drill and there are no obstructions, which
could be hidden by the construction of the wall, for example: Electrical
wiring, water & gas pipes or supporting lintels or beams.
z
Ensure that a spirit level is used, as the unit must be level.
z
Follow the installation instructions & measurements in full.
Important: Drilling Air intake/Discharge/Drainage holes
z
It is recommended that the holes are drilled with a slight downward
inclination of 3-5 degrees to prevent any backflow of water and make
drainage easier.
1M