
955692_2
8
Indicator Light Overview
Color
Display Base Module
Display
FieldView Module
Green
Good Connectivity
Good Connectivity
Good Connectivity
White
Initializing
N/A
Downloading Software
Blinking White
Firmware Update in
Process
N/A
N/A
Yellow
No Connection between
Display and DBM
Initializing
Initializing
Blinking
Yellow
Software Update in
Process
Software Update in
Process
Software Update In
Progress
Blue
CCM Connectivity is
Missing
N/A
Nothing Connected
Purple
Need to Power Cycle
System
N/A
FieldView Not Connected
Red
N/A
Powering On
Powering Up
Blinking Red
Failure - Call Precision
Support
N/A
N/A
Powering the 20|20 On and Off
The monitor must have 12 volts of both switched and constant power. With the power harness
connected to the DBM and power supply, turn the key on the tractor to the On or Run position.
Switch the power button on the DBM to the On position.
To power the system off, either switch the power button on the DBM to the Off position or key
the tractor/combine off.