
955692_2
10
Cab Installation
Step 1:
Mounting locations will vary from combine to
combine. Mount the display or both displays for
optimal visibility and interaction for the operator.
There are several mounting options offered by
Precision Planting available for the display. The
diagram depicts the display with a RAM mount. Refer
to Appendix B and the YieldSense Installation Guides
for combine specific harness routing details
Step 2:
The Display Base Module [DBM] can be located in
any convenient area of the cab. Ensure the DBM will
not move around when operating the combine. Plug
one end of the provided Ethernet cord into either port
on the front of the DBM and the other end into the
back of the display. If using two displays connect the
second display with the provided Ethernet cable to the
other open port on the DBM.