Maintenance and care
General
52
Item No.: 099-004838-PRA01
7
Maintenance and care
7.1
General
Under the indicated environmental conditions and normal operating conditions, this machine is largely
maintenance-free and requires minimum care. However, a number of points should be observed to
guarantee fault-free operation of your welding machine. Among these are regular cleaning and checking
as described below, depending on the level of contamination in the environment and the usage time of
the welding machine.
Cleaning, testing and repairing of the welding machines may only be carried out by competent,
capable personnel. A capable person is one who, due to training, knowledge and experience, is
able to recognise the dangers that can occur during testing of welding power sources as well as
possible subsequent damage and who is able to implement the required safety procedures.
In the event of failure to comply with any one of the following tests, the machine must not be
operated again until it has been repaired and a new test has been carried out.
7.2
Cleaning
Before cleaning, carefully disconnect the machine from the mains. PULL OUT THE MAINS PLUG.
(Switching off or pulling out the fuse does not provide adequate insulation protection)
Wait 2 minutes until the capacitors are discharged. Remove the casing cover.
The individual components should be handled as follows:
Power source: Depending on the amount of dust, blow out power source using oil- and moisture-free
compressed air.
Electronics: Do not blast electronic components or circuit boards with compressed air but instead use
suction from a vacuum cleaner for cleaning purposes.
7.3
Repetition Test conforming to E VDE 0544-207, conforming to the
German Ordinance on Operational Safety
In addition to the regulations on the repetition test given here, the relevant local laws and
regulations must also be observed.
The repetition test must be conducted in accordance with E VDE 0544-207 "Repetition test on arc
welding equipment". This draft standard covers all the required test points specifically for welding
machines, as mentioned in VDE 0702 "Repetition test on electrical equipment", in addition to
special instructions for usage and differing limit values.
Unfortunately, many test devices are not suitable for VDE 0702 in all respects due to the special
circumstances in inverter arc welding machines!
Recommendation: Ask your test engineer whether he is performing the test in accordance with E VDE
0544-207, his measuring equipment conforms to VDE 0404-2 and the frequency response is being
evaluated in accordance with DIN EN 61010-1 Appendix A – Measuring Circuit A1. Have this confirmed in
writing if necessary.
The manufacturer has specified suitable test equipment and provides your specialist dealer with the
necessary support required to correctly complete a repetition test conforming to E VDE 0544-207.
If the repetition test is not conducted in conformance with standards and/or not at the specified
intervals, the warranty becomes null and void!
The following description of the repetition test is only a brief overview of the products to be
tested. For details on the test points or in the event of any queries, please refer to E VDE
0544-207.
Содержание PHOENIX 401 BASIC PULS forceArc
Страница 7: ...Safety instructions PHOENIX 401 BASIC PULS forceArc Item No 099 004838 PRA01 7 2 Safety instructions ...
Страница 8: ...Safety instructions PHOENIX 401 BASIC PULS forceArc 8 Item No 099 004838 PRA01 ...
Страница 9: ...Safety instructions PHOENIX 401 BASIC PULS forceArc Item No 099 004838 PRA01 9 ...
Страница 18: ...Machine description PHOENIX BASIC DRIVE 4L 18 Item No 099 004838 PRA01 4 2 2 Rear view Figure 4 4 ...