GSW
CP.
#
Description
1
Switch with double fuel loading pump
(optional).
2
Emergency button.
3
Acoustic alarm signal emitter for faults
detected by the electronic control board.
4
Switch with optional double starting system.
5
Electronic control board.
NOTE
General guidelines concerning the
various types of control boards are
provided here. Refer to, read and
understand the use and maintenance
manual of the specific electronic
boards and wiring diagrams supplied.
Manual panel with digital board:
The panel in manual configuration is equipped with
an electronic control board which displays alarms
and operating states of the generator by means of
LED signals (CP. 5 in following figure).
The figure shows the main parts of the manual
panel:
CP.
#
Description
1
Main switch or disconnecting device.
2
Emergency button.
3
Control panel power ON/OFF key selector:
•
1st click to the right to switch on
panel and instruments (optional).
•
2nd rotation to the right to start the
generator.
•
Vertical key position to switch
generator off.
4
Circuit breaker/differential switches for each
electric socket of the panel.
5
Manual control board with indicator LEDs.
6
Space reserved for installation of socket kit
(present in the image and optional).
7
Visible fuse kit (optional).
8
Load connection bars by means of cable
(below protection panel indicated in the
figure).
NOTE
General guidelines concerning the
various types of control boards are
provided here. Refer to, read and
understand the use and maintenance
manual of the specific electronic
boards and wiring diagrams supplied.
5.4
Electronic control board
commands
For further information, see the specific
documentation of the electronic board attached to
this manual.
86
5.USE