www.praherplastics.com
8
Assembly
9
Device installation
– installation of the valve
Install the valve in the conduit according to the labelling and the sketch below. Use adapter
unions. Threaded connections should be sealed only with Teflon strip. Although the device is
functional in any position, it must not be installed with the actuator facing down.
If the difference in level between system and tank exceeds 3 meters, stop valves or non-return
valves should be installed to prevent severe damage to the actuator and the valve due to
excessive pressure and flow.
As filter medium can be washed out during backwashing and rinsing, we recommend fitting the
drain with a throttle. Otherwise a stuck valve disk can adversely affect the flawless functioning
of the Aquastar. Polluted or grainy filtering media require the use of adequate pre filters.
Important! During a cycle the filter pump motor must be shut off!
The Praher Aquastar Comfort is approved for 6-way valves by Praher Plastics Austria.
Malfunctions can occur with any other valve type as we are unable to guarantee that
these valves match the dimensions of the Praher 6-way valves.
9.1 Functiondiagram for Praher Plastics Austria V6 valves
Cleaning of filter medium
(i.e. Sand) after backwash
Pool
Pump
Valve
(to filter)
Filter
Valve
(from filter)
Waste
Filtration of medium
(i.e. Water)
Pool
Pump
Valve
(to filter)
Valve (from
filter)
Pool
No circulation.
Do not operate pump
Pool
Pump
Valve
Drainlage of pool with
pump
Pool
Pump
Valve
Drain
Cleaning up filter medium
(i.e. Sand) in upstream
(reversed flow in filter)
Pool
Pump
Valve
(from filter)
Filter
Valve (to filter)
Waste
Recirculation of fluid
without filter (Bypass filter)
Pool
Pump
Valve
Pool
Pump
from pump
Top
to the filter
Bottom
from filter
Return
to the pool
Waste
to the drain
6-way valve type:
Connections
Max. Operating pressure
1,5”, 2” and 3”
: Thread or stick (all connectors open)
: ABS 1,5”,2” and 3" 3,5 bar
GFK 1,5”,2” 6 bar
GFK 3” 5 bar
Содержание AQUASTAR mp6 plc
Страница 1: ...Zertifiziert nach certified acc to EN ISO 9001 2008...
Страница 3: ...3 www praherplastics com Montage 18 16 Demontage 19 17 Zubeh r 20 18 Fehlerbehebung 20 19...
Страница 15: ...15 www praherplastics com Platinen 13 13 1 Mainboard 13 2 Aquastar 230V Netzteil...
Страница 17: ...17 www praherplastics com Explosionszeichnung des Aquastar 15...
Страница 19: ...19 www praherplastics com Demontage 17...
Страница 21: ...21 www praherplastics com Notizen Notes...
Страница 23: ...3 www praherplastics com Installation 18 16 Dismantling 19 17 Accessories 20 18 Trouble shooting 20 19...
Страница 35: ...15 www praherplastics com Circuit board 13 13 1 Mainboard 13 2 Aquastar 230V Power supply Dimensions 14...
Страница 37: ...17 www praherplastics com Exploded view drawing of the Aquastar 15...
Страница 39: ...19 www praherplastics com Dismantling 17...
Страница 41: ...21 www praherplastics com Notizen Notes...
Страница 42: ...www praherplastics com 22 Notizen Notes...
Страница 43: ...23 www praherplastics com Notizen Notes...