The flue terminal must not be installed so as to be less than:

- 300mm below an opening e.g. window, air brick etc.

- 200mm below eaves or gutter.

- 300mm from an internal or external corner.

- 1200mm from a surface facing the terminal.

- 1500mm vertically from another terminal on the same wall.

- 300mm horizontally from another terminal on the same wall.

- 2000mm from ground level.

4.3.3 Installation of Flue System

4.4 Oil Connection

The oil pipework length and diameter should be in accordance 

with the information given in the burner instruction booklet. 

The pump suction should not exceed 0.4 bar.

The oil line must terminate not more than 450mm from the 

burner with the final connection by the flexible hoses supplied 

with the burner.

Because the burner is firing downward it is recommended that 

an additional oil solenoid valve (available as an optional extra) 

is fitted adjacent to the burner, and wired as shown in Section 

(Page 9)

, to eliminate any possibility of syphoning through 

the burner.

4.5 Electrical Connections

All units are fully prewired and only require final connection 

of the incoming mains supply and completion of the control 

circuit (230V) via a room thermostat, time clock etc.

All units must be earthed. The electrical supply must be run to 

a point adjacent to the heater and be suitably terminated to 

provide an isolation point that will prevent remote activation 

of the unit during servicing. See Table 3 

(Page 3)

 to ascertain 

the electrical loading of the unit(s) so that cables of adequate 

cross-sectional area are used for the electrical installation. The 

length of the conductors between the cord anchorage and the 

terminals must be such that the current carrying conductors 

become taut before the earth conductor if the cable or cord slips 

out of the cord anchorage. All external controls must be of an 

approved type.

See the wiring diagram in Section 8 

(Page 9)

.

OUH/D models supplied less fan must be electrically interlocked 

to the air movement system so that this is started in the same 

manner as the air heater fan would be viz. A connection from 

the heater terminal marked “Live Main Fan” must be made to 

one side of the fan motor contactor coil, the other side of the 

coil being connected to Neutral. The fan motor electrical supply 

must be direct and not taken from the internal wiring of the 

OUH heater.

Содержание OUH series

Страница 1: ...Users Installation and Servicing Instructions WARNING THIS APPLIANCE MUST BE EARTHED CE OUH Range Users Installation Servicing Instructions Issue 4 March 2010 The OUH Range...

Страница 2: ...s and local regulations 2 The appliance has been professionally commissioned 3 The appliance has been maintained on a yearly basis by a competent servicing company 4 The appliance has been used in acc...

Страница 3: ...5 minutes later the heater fan will automatically stop 4 1 Summer Winter Modes Certain types of external controls will provide for two modes of operation i e Summer The heater fan alone will run at th...

Страница 4: ...n of Heater 5 5 Air Distribution System 7 6 Commissioning Testing 7 7 Servicing 7 8 Wiring Diagram 9 9 Short List of Parts 9 Figure Title Page 1 Limit Thermostat 8 Table Title Page 1 Dimensions 3 2 Sp...

Страница 5: ...s The OUH F has an axial type fan assembly fitted at the rear of each heater to circulate the air being heated across the combined combustion chamber heat exchanger A centrifugal fan variation is pres...

Страница 6: ...0 F OUH20 C Rear View E F F D A K Side View B C M Front View Rear View L 50mm Side View J H G Front View OUH30 45 60 C OUH30 45 60 F Rear View E F D A K Side View B C M Front View Rear View 50mm L Sid...

Страница 7: ...l flue diameter THROW 8 5 16 1 25 3 34 1 N A N A N A N A Table 4 Burner Settings 35sec Oil Net CV Hi 42 69MJ kg Riello Burners Nozzle Pump Head Setting Combustion Nominal Model Type Make Size Angle Ty...

Страница 8: ...t 2 Particular attention is drawn to the following a Pipe jointing compounds must be capable of withstanding the solvent action of the fuel oil under all operating temperatures and pressures Jointing...

Страница 9: ...Rating Air Vent Area of Air Heaters Air direct from outside Up to 60kW 4 5 cm kW in excess of 7kW From 60kW up to 730kW 4 5 cm kW Where the air heater is to be installed in a plant room the heater re...

Страница 10: ...inal connection of the incoming mains supply and completion of the control circuit 230V via a room thermostat time clock etc All units must be earthed The electrical supply must be run to a point adja...

Страница 11: ...a Powrtrol or MC200 is being used that the Winter mode is selected 6 5 Lighting the Air Heater Refer also to the burner instruction booklet 1 Remove the burner cover after releasing the three retainin...

Страница 12: ...ur hexagon headed bolts that secure the fan to the rear panel 6 Reassemble in reverse order 7 5 2 Centrifugal Fan 1 Inspect the fan blades to see that they are not damaged and that there is no build u...

Страница 13: ...ue Brown Black Gr Yellow MAIN FAN CAPACITOR VENT VENT CLOCK O P HEAT IN HEAT OUT L N POWRTROL Additional Oil Valve 8 Wiring Diagram 9 Short List of Parts Only originally specified parts may be fitted...

Страница 14: ...rovement we reserve the right to alter specifications without prior notice HEATING DIVISION Hort Bridge Ilminster Somerset TA19 9PS Tel 01460 53535 Fax 01460 52341 BSI Registered Firm FM 414 Ind Comm...

Отзывы: