![Powrmatic CECx 1400 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/powrmatic/cecx-1400/cecx-1400_user-installation-and-servicing-manual_1592535006.webp)
page no. 6 of 12
CECx
Users, Installation & Servicing Instructions Doc Ref M503 issue 3.3 Jan 2020.
The calecon unit is equipped with four suspension points,
one on each corner. These take the form of an eyebolt.
Using either our fixing kit, chain or wire rope, connect each
point to a rigid construction i.e. Unistrut, girders etc.
WARNING: Ensure the framework is
adequate to take the weight of the particular
destratification unit. Once the
destratification fan is in position, the wiring
can commence.
The CECx fixing kit is a fast locking solution for quick and
easy suspension of our CECx destratification fans.
Features:
• Up to 6 times faster to install than traditional
methods
• Key-less - no tool required for adjustment
• Ergonomic buttons allow rapid adjustment
• Discreet and aesthetic design
• Load rated at 45 kg per wire with a 5:1 safety factor
• Supplied as a ready-to-use kit
Installation:
Roof Purlins
Fastener
Snap Hook
Wire Rope