33
LIMIT ADJUSTMENT PROCEDURE
▲
WARNING:
TURN OFF MAIN POWER BEFORE
MAKING ANY ADJUSTMENTS!
1. After the gate is mechanically installed, move the
gate to a midway position using the manual hand
crank or cordless drill.
NOTE:
When moving the gate manually, the limit nuts
in the electric box can be driven past their normal
position. Reset the limit nuts as necessary, by
depressing the pressure plate and rotating the limit
nuts until they are both positioned near the center of
the limit shaft.
2. With the gate at mid travel, depress the pressure
plate and set the grooved limit nuts
approximately 1 inch from the limit switches on
each side.
Open Limit
Switch
Pressure
Plate
Limit Nut
1"
Close Limit
Switch
34
3. Check that Dipswitch #2 is in the correct position for
left or right hand operation as previously determined.
1 2 3 4 5
ON
OFF
1 2 3 4 5
ON
OFF
Place Dipswitch #2
In "ON" Position For Left
Hand Operation And
"OFF" Position For Right
Hand Operation.
Left Hand
Operation
Right Hand
Operation
CO
M
CO
M
CO
M
24
V
AC
24
V
AC
ALT
RD
O
OP
N
CR
O
FR
E
OP
N
CLO
ST
O
CO
M
CO
M
CO
M
OP
N
PH
O
CLO PH
O
SH
W
RE
V
OP
N
ED
G
CLO
ED
G
MS
T
OP
N
MS
T
CLO
CO
M
CO
M
CO
M
OPEN
PUSH
FREE
EXT
ALT
RADIO
OPN/
CLO
RADIO
OPEN
CLOSE
PUSH
STOP
PUSH
CLOSE
PHOTO
OPEN
PHOTO
LD18
LD10
LD11
LD12
LD15
LD14
LD16
LD17
LD13
OPEN
CLOSE
STOP
OPEN
CLOSE
FORCE
ADJUSTMENT
AUTO
RECLOSE
TIMER
OFF MAX
MID
LIMIT
REV
LOOP
OPN
EDGE
CLO
EDGE
RH OPN
LH CLO
LIMIT
RH CLO
LH OPN
LIMIT
MOTOR
OPEN
MOTOR
CLOSE
SHADOW
LOOP
LD19
LD2
LD3
LD4
LD5
LD6
LD8
LD9
LD7
1 2 3 4 5
POWER
LD1
P3
P4
TB1
TB2
U1
U2
U4
4. Turn on power.
NOTE:
Operator will not run if manual crank lever is
engaged.
▲
WARNING:
STAY CLEAR OF ALL MOVING
PARTS AND ELECTRICAL COMPONENTS OF THE
OPERATOR WHILE TESTING!
NOTE:
The first time the gate operator is run after the
power is turned on, a 3 second warning will sound before
the operator starts.
5. Open the gate electrically using the
THREE BUTTON
control station mounted on the control board.