
45
Assembly Instructions
Step 9 – Tow Bar to Beam
Insert vertical pin through vertical pin hole in tow bar assembly and
beam assembly.
Insert lynch pin through hole in vertical pin to secure.
Tools Needed
Fasteners Needed from Parts Bag:
Vertical Pin
Part #: 791183
Qty: 1
Lynch Pin
Part #: 39159
Qty: 1
Tow Bar
Vertical Pin
Lynch Pin
Beam
Vertical Pin Hole
Содержание M11966C.2
Страница 2: ...2 Hazard Signal Word Definitions...
Страница 26: ...26 Parts Breakdown Exploded View 11966 Rev C 2...
Страница 34: ...34 Assembly Instructions Manual Bag Contents Manual Bag Parts Bag Owner s Manual Hydraulic Valve...
Страница 54: ...54 Manufactured by Northern Tool Equipment Co 2800 Southcross Drive West P O Box 1499 Burnsville MN 55337 0499...