63
Assembly Instructions
Step 22B – High Pressure Supply Hose for 1169 Only
Route the High-Pressure Supply Hose from the high pressure fitting
on the pump up to the Large Swivel Fitting on the control valve inlet.
Screw finger-tight High-Pressure Supply Hose to the high pressure
fitting on the pump outlet.
Wrench tighten 1.5-3.0 turns past “finger tight”
Screw finger-tight remaining end of the High-Pressure Supply Hose to
the Large Swivel Fitting on the control valve inlet.
Wrench tighten 1.5-3.0 turns past “finger tight”
Tools Needed
1” Wrench
7/8” Wrench
OR
Crescent Wrench
(2 Needed)
Large
Swivel
Fitting
High Pressure
Supply Hose
High Pressure
Fitting
High Pressure
Hose
1” Wrench
7/8” Wrench
Содержание M1175B
Страница 2: ...2 Hazard Signal Word Definitions...
Страница 27: ...27 Parts Breakdown Exploded View 1175 1169 Rev B 1175 Shown...
Страница 44: ...44 Assembly Instructions Step 6 Tank Weldment Remove axle nuts from axles Tools Needed None Axle Nut Axle...
Страница 68: ...68 789712 Engine Exploded View...
Страница 71: ...71 790160 Engine Exploded View...
Страница 76: ...76 Parts Descriptions Not Applicable Not Applicable Not Applicable Not Applicable...
Страница 89: ...89...
Страница 90: ...90...
Страница 91: ...91...
Страница 93: ...93 This page has intentionally been left blank...
Страница 94: ...94 Manufactured by Northern Tool Equipment Co 2800 SouthCross Drive West P O Box 1499 Burnsville MN 55337 0499...