52
Assembly Instructions
Step 13 – Beam to Tank
Stand assembled beam onto the end plate in the vertical position.
Orient the beam assembly and tank weldment as shown. Make sure a
helper holds onto the top of the beam assembly during the remainder
of this step. The beam is very heavy and dangerous if it tips over
Align the pivot bracket on beam assembly to the pivot mount on the
tank weldment and insert (1)beam pivot pin
Insert (1) cotter pin through hole in beam pivot pin and spread and
bend prongs in opposite directions to secure
Tools Needed
Pliers
Fasteners Needed from Parts Bag:
Cotter Pin
Qty: 1
Beam Pivot Pin
Qty: 1
Beam Assembly
Tank Weldment
Pivot Mount
Beam Pivot Pin
Cotter Pin
Pivot Bracket
Содержание M1175B
Страница 2: ...2 Hazard Signal Word Definitions...
Страница 27: ...27 Parts Breakdown Exploded View 1175 1169 Rev B 1175 Shown...
Страница 44: ...44 Assembly Instructions Step 6 Tank Weldment Remove axle nuts from axles Tools Needed None Axle Nut Axle...
Страница 68: ...68 789712 Engine Exploded View...
Страница 71: ...71 790160 Engine Exploded View...
Страница 76: ...76 Parts Descriptions Not Applicable Not Applicable Not Applicable Not Applicable...
Страница 89: ...89...
Страница 90: ...90...
Страница 91: ...91...
Страница 93: ...93 This page has intentionally been left blank...
Страница 94: ...94 Manufactured by Northern Tool Equipment Co 2800 SouthCross Drive West P O Box 1499 Burnsville MN 55337 0499...