![Power Apex Bike Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/power/apex-bike/apex-bike_instruction-manual_1585683012.webp)
8.
Once the two panels are on which go at the side both sides of the doors (door wings), you can add the door
head. This is the part which has the ‘Power’ brand on. To secure these to the panels below you need to
screw up through the door wings and into the door head. We strongly advise you to
pre-drill before
screwing to avoid the timber splitting
. You can then secure the door head to the side wall panels.
9.
When you have secured all the wall panels together you then need to secure these to the floor using 70mm
screws provided. Screw into the floor with 2x screws for every wall panel (internally) ensuring the screws are
driven through the framing at the bottom of the side/gable walls, through the floorboards and into the floor
joists.
USEFUL TIP!
You can work out the position of the floor joists from the location of the existing nails in the floor. If the
upright framing or corner brace is in the way you would need to nail down into the floor joists at an angle.
If you are securing these panels against a wall (which gives you little access to nail the cover strips on, explained
later) you can pre-assemble a side and move the whole side into position (with the cover lats already nailed on)
PAGE 11 OF 18
Содержание Apex Bike
Страница 2: ...Power Apex Bike Shed...