![Poulan Pro Pro 925 ZX, Pro 950 ZX Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/poulan-pro/pro-925-zx-pro-950-zx/pro-925-zx-pro-950-zx_operators-manual_1584751021.webp)
English-
19
CONTROLS
4. By pass linkages
When pushing or pulling the mower, be sure
to engage the EZT (Integraded Zeroturn
Transaxle) bypass linkages. The EZT bypass
linkages are located on the rear of the frame,
below the rear engine guard.
•
Raise the deck into the highest cutting
position.
•
Pull the EZT bypass linkages out and
into the slots and release so that it is held
in the bypass position.
•
To reengage the EZT’s to drive, reverse
the above procedure.
8011-721
1. EZT Bypass linkage
Bypass linkages
8011-722
1. Head outside of rear deck
2. EZT Bypass linkage in bypass position
Bypass position
Содержание Pro 925 ZX, Pro 950 ZX
Страница 2: ......
Страница 69: ...English 67 SERVICE JOURNAL After the First 5 8 Hours 1 Change engine oil ...
Страница 75: ...English 73 SERVICE JOURNAL Action Date mtr reading stamp sign ...
Страница 76: ...English 74 SERVICE JOURNAL Action Date mtr reading stamp sign ...
Страница 77: ...English 75 SERVICE JOURNAL Action Date mtr reading stamp sign ...
Страница 78: ......
Страница 79: ......
Страница 80: ...113920Rir 07 11 06 ...