18
INSTALLATION INSTRUCTIONS - Page 18
Figure 16 WIRING THE BOILER FOR
COMBINED GRAVITY HOTWATER/PUMPED
CENTRAL HEATING SYSTEM
Route a three core cable through the plastic bush in the rear
of the control box and the cable clamp as illustrated I Fig 16.
Connect the cable to the boiler input terminals as follows:
Switched live on the GRAVITY DHW control circuit to
terminal marked MAINS ‘SwL’
Neutral to terminal marked MAINS ‘N’
Earth to terminal marked MAINS
Secure the cable within the clamp by tightening the two
securing screws.
The pump should be connected to PUMPED CENTRAL
HEATING control circuit at the junction box. See FIG. 13
Figure 17 FUNCTIONAL FLOW DIAGRAM
Figure 18 BOILER WIRING DIAGRAM
Содержание PRIMA 30C
Страница 4: ...4 GENERAL ARRANGEMENT Page 4 Figure 2 GENERAL ARRANGEMENT ...
Страница 12: ...12 TECHNICAL DATA Page 12 Figure 6 FULLY PUMPED SEALED SYSTEM ...
Страница 22: ...22 SERVICING INSTRUCTIONS Page 22 Figure 21 PREPARING THE BOILER FOR SERVICING Figure 21B Figure 21C ...
Страница 26: ...26 SERVICING INSTRUCTIONS Page 26 Figure 23 FAULT FINDING CHART ...